background image

C

ASE

 C

ONNECTIONS

REFRIGERATION

As the diagram below indicates, the coil outlet hole is 
positioned forward on the right-hand side of the case, fully 
visible in front of the fan plenum.

The expansion valve and other controls - located on the 
left-hand side of the case - are accessible without lifting the 
fan plenum and may be reached by lifting the deck pans.

If it becomes necessary to penetrate the case bottom, be 
certain to seal it afterwards with canned-foam sealant and 
white RTV.

PLUMBING

The drain outlet is specially molded out of PVC material 
and is located in the center of the case for convenient ac-
cess.  The “P” trap, furnished with the case, is constructed 
of schedule 40 PVC pipe.   Care should be given to ensure 
that all connections are water-tight and sealed with the ap-
propriate PVC or ABS cement.

The drain lines can be run left or right of the tee with the 
proper pitch to satisfy local drainage requirements.  Since 
the kickplate is shipped loose with the case, you should 
have open access to the drain line area during installation.

35 1/16 in

 [89.1 cm]

**

39 3/8 in

 [99.9 cm]

41 5/16 in

 [104.9 cm]

31 11/16 in
 [80.5 cm]

FRONT OF CASE

C

L

1 1/2 in [3.8 cm] {END}

96 in [243.8 cm] (8' CASE)

8 11/16 in [22.1 cm]

 4 in[10.2 cm]

28 5/8 in

 [72.7 cm]

REFRIGERATION

REAR REFRIGERATION

(11 3/4" OFF OF FLOOR)

22 9/16 in [57.3 cm]

20 1/16 in [51.0 cm]

35 3/16 in

 [89.4 cm]

JUNCTION BOX
(STANDARD)

ELECTRICAL

1 1/2" PVC DRAIN

CONNECTION

33 9/16 in

 [85.3 cm]

MODEL

UPL-NRG

REMOVE THE SHIPPING BLOCKS THAT PROTECT THE 
REFRIGERATION LINES DURING SHIPMENT BEFORE 
OPERATING THE CASE.

REMOVE

If the kickplate has been installed, you will 

fi

 nd it very easy 

to remove.  Simply lift the kickplate up from the "J" rail and 
pull it out, away from the case.  See the Trim Out section 
on page 6.

ELECTRICAL

Electrical hookups are made to a junction box located at 
the bottom-left-front of the case.

For case-to-case wiring, run conduit between the junction 
boxes.  When connecting to the junction box on the bottom-
left side of the case, 

fi

 eld wiring should exit box from the 

right side (furthest away from case wiring) to allow more 
room inside for wiring connections.

     

C A U T I O N

If any brazing is necessary, place wet rags 

around the area to avoid tank damage.

7

Содержание UPL-NRG

Страница 1: ...rgy Data 2 Case Dimensions 3 General Information 4 Installation 5 6 Case Connections 7 Airflow Defrost Temp Control 8 Use Maintenance 9 Parts Ordering 10 Appendix A Wiring Diagrams Installation Operat...

Страница 2: ...ii...

Страница 3: ...installation and operations handbooks accompanied by an alert symbol paired with the word DANGER WARNING or CAUTION All warning messages will inform you of the potential hazard how to reduce the risk...

Страница 4: ...ding without limita tion to the display itself to the location where the display is situated e g store and to any surrounding property DO NOT use misting systems water hoses or other devices that spra...

Страница 5: ...g protected When de energizing refrigeration units containing R 744 CO2 venting of the R 744 CO2 refrigerant may occur through the pressure regulating relief valves These valves are located on the ref...

Страница 6: ...Control Settings Model 2 BTUH ft Superheat Set Point Bulb oF Evaporator oF Discharge Air oF Return Air oF Discharge 3 Air Velocity FPM UPL NRG 500 6 8 26 30 40 250 Model Defrosts per Day Electric Defr...

Страница 7: ...L 1 1 2 in 3 8 cm END 96 in 243 8 cm 8 CASE 35 7 16 in 90 0 cm 46 7 16 in 117 9 cm 48 7 16 in 123 1 cm 8 5 8 in 21 9 cm 33 1 4 in 84 4 cm 25 1 16 in 63 6 cm 8 in 20 3 cm 3 13 16 in 9 7 cm 22 11 16 in...

Страница 8: ...in the event of shipping damage and or shortages please contact the Service Parts Department at the toll free number listed below CASE DAMAGE Claims for obvious damage must be 1 noted on either the f...

Страница 9: ...orse positions along the chalk line Spot properly leveled shim packs at each basehorse loca tion Fig 1 Caster assembly CASTER WA R N I N G Be certain that your hands and feet are out of the way before...

Страница 10: ...rail with the supplied screws Fig 4 6 Insert top of kickplate into the kickplate retainer Slide the kickplate up into the retainer then down onto the J rail Fig 4 Be certain that the bottom of the ki...

Страница 11: ...the drain line area during installation 35 1 16 in 89 1 cm 39 3 8 in 99 9 cm 41 5 16 in 104 9 cm 31 11 16 in 80 5 cm FRONT OF CASE C L 1 1 2 in 3 8 cm END 96 in 243 8 cm 8 CASE 8 11 16 in 22 1 cm 4 i...

Страница 12: ...below It is important that you do not overload the food product dis play so that it impinges on the air flow pattern Overloading will cause malfunction and the loss of proper temperature levels partic...

Страница 13: ...rary separator e g cardboard plas tic rap etc between those cases that are being cleaned and those that may still contain product Avoid spraying cleaning solutions directly on electrical connections A...

Страница 14: ...part is intended Length of the part if applicable Color of part if painted or color of polymer part Whether part is for left or right hand application Quantity Serial plate is located on the back of...

Страница 15: ...APPENDIX A WIRING DIAGRAMS...

Страница 16: ......

Страница 17: ...NOTES...

Страница 18: ...NOTES...

Страница 19: ...ales tax or upgrading 5 When the operation is impaired due to improper installation 6 When installation and startup forms are not properly complete or returned within two weeks after startup THIS PLAN...

Страница 20: ...er directly on fan motors or any electrical connections All lighting receptacles must be dried off prior to inser tion and re energizing the lighting circuit Please refer to the Use and Maintenance se...

Отзывы: