background image

                                                                                                                        DS-3D2208P 

Hardware 

Installation 

Manual 

- 4 - 

  ROHS Description 

 

Содержание DS-3D2208P

Страница 1: ...DS 3D2208P Hardware Installation Manual...

Страница 2: ...Installing the DS 3D2208P Switch 9 3 1 Installation Flow of DS 3D2208P 9 3 2 Installing the Chassis of the Switch 9 3 2 1 Installing the Machine Box on the Desk 10 3 2 2 Installing the Chassis on the...

Страница 3: ...Ethernet port UTP RJ45 port with the LINK ACT LED which can be powered through the PoE mode and has the PoE LED 1000M Ethernet port SFP port and UTP port RJ45 having LINK ACT LEDs Console port An RJ4...

Страница 4: ...Abbrev Name Remarks 1 None Power switch ON means the power source is opened while OFF means the power source is cut down 2 None AC power socket AC100 240V 3 None Grounding column The grounding must be...

Страница 5: ...8M Bytes SDRAM 64MBytes Standard configuration 8 10 100BASE T PoE ports 2 10 100 1000 Base T ports 2 1000M SFP optical ports One Console port Specifications 340mm 200mm 44mm Working temperature humidi...

Страница 6: ...DS 3D2208P Hardware Installation Manual 4 ROHS Description...

Страница 7: ...ne horizontal with the power socket 2 When the lifetime of our products ends handle them according to national laws and regulations or send these products to our company for collective processing Safe...

Страница 8: ...s on do not touch the power 16 Correctly connect the device and the power socket 17 Only professionals are allowed to operate and maintain the device 18 Read the installation guide carefully before th...

Страница 9: ...ad ventilation and untouchable control plate will cause maintenance problems systematic faulty and breakdown For location planning and device locating refer to section 2 3 2 Location Configuration Pre...

Страница 10: ...essary At least a 240 V 10A fuse or a breaker is provided in the phase line if you prepare the short circuit prevention measures for a building Caution If the power supply system does not have good gr...

Страница 11: ...DS 3D2208P Installing the Chassis of the Switch The chassis of the router can be installed on the desk or can be fixed to other cabinets Your network installation requirements can be met if you conduc...

Страница 12: ...itch faces forward The detailed operations are shown in Figure 3 1 Figure 0 1 Fixing the machine box of the switch Note The switch shown in the previous figure does not represent real DS 3D2208P switc...

Страница 13: ...tion parameters of the terminal serial port can be set to a rate of 9600bps eight data bits one stop bit no sum check bit and traffic control The RJ45 connector of the console port is shown in the fol...

Страница 14: ...gle pass problem will arise on the super terminal Otherwise the single pass problem will arise on the super terminal The cable is used to connect the console port of the DS 3D2208P switch and the outs...

Страница 15: ...five classes of direct through cross network cables when it connects other Ethernet terminals Figure 0 7 Connecting the 10 100Base T port and other Ethernet terminals Note The switch shown in the pre...

Страница 16: ...nnecting the 1000Base T port and other Ethernet terminals Both the connection method and the connection diagram of the 1000M Ethernet port are same to those of the 100M Ethernet port but the definitio...

Страница 17: ...and other switches Note The switch shown in the previous figure does not represent a real DS 3D2208P switch Checking after Installation Before electrically starting up the switch perform the following...

Страница 18: ...DS 3D2208P Hardware Installation Manual 16 44 Check whether the switch is correctly connected to other terminal devices...

Страница 19: ...and operation methods Caution When the power cable still connects the power source do not touch it When you open the cover the switch you may use the following tools These tools are 48 Crossed screwdr...

Страница 20: ...s Do as follows 1 Put them well according to their locations and joint them together along their sides 2 See the following figure 3 When the cover and the bottom are closely tied let the cover slide t...

Страница 21: ...t check whether the air outlet and air inlet are clean and then do relative operations in section 2 3 Requirements for Common Locations The working temperature of the switch is from 0 to 40 Celsius de...

Страница 22: ...powered on the LED is on 2 SYS System LED If the LED is always on the system is being started If the LED flickers the system works normally 3 LINKACT LED at the top of each port If the LED is always o...

Отзывы: