Figure 3-25 Cave the Installation Hole
2.
Remove the plastic sheet of the cable entry which will be used.
3.
Insert the gang box into the hole and pull out the cables through the cable entry.
Mark the screw holes’ position with a marker, and take out the gang box.
Figure 3-26 Mark the Screw Holes
4.
Chisel 4 holes with drill align to marks on the wall, and insert the expansion
sleeves into the screw holes. The suggested size of hole is 6 (diameter) × 45
(depth) mm.
5.
Fix the gang box with 4 expansion bolts.
Module Door Station Quick Start Guide
28
Содержание Door Station
Страница 1: ...Module Door Station Quick Start Guide...
Страница 6: ...4 4 1 Dial via Main Unit 47 4 4 2 Dial via Nametag Module 48 Module Door Station Quick Start Guide v...
Страница 42: ...Figure 3 39 Fix the Cover 3 4 2 More Than Three Module Flush Mounting Module Door Station Quick Start Guide 36...
Страница 49: ...Figure 3 50 Fix the Cover Module Door Station Quick Start Guide 43...
Страница 56: ...UD13690B...