background image

 

HIGHWAY EQUIPMENT COMPANY - NEW LEADER DIVISION 

1330 76

th

 AVE SW,  CEDAR RAPIDS,  IOWA  52404-7052  

 

PH. (319) 363-8281 

www.highwayequipment.com 

FAX (319) 632-3081 

 

HIGHWAY EQUIPMENT COMPANY

 

G

4

 

 

 

HOW TO 

CHECK YOUR 

 

G4 SPREAD PATTERN 

 
 
 
 
 

 

 

Содержание NEW LEADER G4

Страница 1: ...EQUIPMENT COMPANY NEW LEADER DIVISION 1330 76th AVE SW CEDAR RAPIDS IOWA 52404 7052 PH 319 363 8281 www highwayequipment com FAX 319 632 3081 HIGHWAY EQUIPMENT COMPANY G4 HOW TO CHECK YOUR G4 SPREAD...

Страница 2: ...NUMBER__________________ MANUAL NUMBER 305438 SP A EFFECTIVE 01 2008 HIGHWAY EQUIPMENT COMPANY 1330 76TH AVE SW CEDAR RAPIDS IOWA 52404 7052 PHONE 319 363 8281 FAX 319 632 3081 www highwayequipment co...

Страница 3: ...ner mounting bracket that sits on the sill to the end of the sill on both sides The distance should be approximately 9 7 8 25 08cm on each side as shown in Figure A Center the spinner assembly from si...

Страница 4: ...the controller in the cab The spinner sensor will measure the spinner s speed Figure C Fin Location for 34 Conveyors 7 Slide the slots of the material divider Item 8 onto both sills so material divid...

Страница 5: ...rmed for each product and application rate Spread pattern is affected by many factors Among the more significant of these are 1 Spinner speed 2 Material weight per cubic foot 3 Material flow character...

Страница 6: ...nd entirely on the material being spread and must be determined by testing Pattern width will vary anywhere from 25 to 55 feet For every material there is a critical fan speed In other words there is...

Страница 7: ...507 Test Tubes 21 70897 Flags 5 300505 Clip Molded 21 87199 Rope 120 marked 1 87332 Funnel 1 87201 Stakes 2 Note Larger containers will be needed SPREADER PREPARATION The spreader to be tested shall b...

Страница 8: ...have a slope of less than two degrees Insert a plastic grid into each of the 21 collection trays Position the 21 collection trays on six foot 6 182 88cm centers with the longest dimension of the tray...

Страница 9: ...addle center collection tray Figure F Set gate opening based on desired rate acre according to theoretical application charts supplied with each unit Drive spreader completely through course at normal...

Страница 10: ...10 HIGHWAY EQUIPMENT COMPANY G4 305438 SP A Page Rev A TEST EQUIPMENT AND PROCEDURES CONTINUED Figure G Spread Chart Example...

Страница 11: ...e effective swath width is consistent with the desired blend If the blend is not consistent a narrower overall swath width should be used and a new optimum driving center effective swath width should...

Страница 12: ...inner blades to a lower numbered hole Light Directly Behind the Vehicle 1 Move the spinner rearward away from conveyor 2 Increase spinner RPM 3 Move one or two spinner blades to a higher numbered hole...

Отзывы: