background image

 

 

HIGHWAY EQUIPMENT COMPANY

 

G

4

 

305438-SP-A

Page Rev. A

 

 

SPINNER ASSEMBLY INSTALLATION 

 

 

WARNING 

Keep spinner assembly supported until mounting is complete.  Never 
exceed workload limits or use slings to lift items over people. 

 

Use the following instructions when installing a G4 Spinner Assembly on a New Leader L5034 G4 
spreader: 

 

 

*9 7/8 = 25.08cm

 

1.

 

Use a suitable lifting device to hoist the 
spinner assembly (Item 1 - Figure A) onto 
the rear of the sills.  Note: The spinner 
assembly weighs approximately 500 lbs. 
(154 kg) Align the spinner assembly holes 
with the sill holes.  Insert four carriage bolts 
(Item 2) through holes, place shield brackets 
(Item 3), then stiffener bars (Item 4) on front 
bolts and attach with washers, lock washers 
and nuts.  Hand-tighten only.  Remove the 
two wooden 2 x 4’s (5.08cm x 10.16cm) and 
hardware used during shipping. 

2.

 

Make sure the spinner assembly is square.  
Measure from the spinner mounting bracket 
that sits on the sill to the end of the sill on 
both sides.  The distance should be 
approximately 9-7/8” (25.08cm) on each 
side as shown in Figure A.  Center the 
spinner assembly from side-to-side by 
measuring from the spinner hub to the sill 
on each side—these two measurements 
should be equal.  Tighten the rear bolts 
securely. 

Figure A – Spinner Assembly Installation

 

Figure B – Shield Installation

 

3.

 

See Figure B.  Install the right-hand (Item 5) and left-hand (Item 6) spinner shields on the spinner 
assembly and attach the shield brackets (Item 3) and stiffener bars (Item 4) to the shields using 
hardware provided.  Attach the spinner guard (Item 7) both spinner shields with hardware provided.  
Tighten all shield hardware securely, including the front bolts of the spinner assembly. 

4.

 

Install the pressure, return and case drain hoses.  Crank the spinner assembly all the way forward 
and back to make sure the hoses and fittings do not interfere with the spinner assembly as it moves.  
Tie all loose areas of hose together with wire ties to prevent contact with moving parts during 
operation. 

 

Содержание NEW LEADER G4

Страница 1: ...EQUIPMENT COMPANY NEW LEADER DIVISION 1330 76th AVE SW CEDAR RAPIDS IOWA 52404 7052 PH 319 363 8281 www highwayequipment com FAX 319 632 3081 HIGHWAY EQUIPMENT COMPANY G4 HOW TO CHECK YOUR G4 SPREAD...

Страница 2: ...NUMBER__________________ MANUAL NUMBER 305438 SP A EFFECTIVE 01 2008 HIGHWAY EQUIPMENT COMPANY 1330 76TH AVE SW CEDAR RAPIDS IOWA 52404 7052 PHONE 319 363 8281 FAX 319 632 3081 www highwayequipment co...

Страница 3: ...ner mounting bracket that sits on the sill to the end of the sill on both sides The distance should be approximately 9 7 8 25 08cm on each side as shown in Figure A Center the spinner assembly from si...

Страница 4: ...the controller in the cab The spinner sensor will measure the spinner s speed Figure C Fin Location for 34 Conveyors 7 Slide the slots of the material divider Item 8 onto both sills so material divid...

Страница 5: ...rmed for each product and application rate Spread pattern is affected by many factors Among the more significant of these are 1 Spinner speed 2 Material weight per cubic foot 3 Material flow character...

Страница 6: ...nd entirely on the material being spread and must be determined by testing Pattern width will vary anywhere from 25 to 55 feet For every material there is a critical fan speed In other words there is...

Страница 7: ...507 Test Tubes 21 70897 Flags 5 300505 Clip Molded 21 87199 Rope 120 marked 1 87332 Funnel 1 87201 Stakes 2 Note Larger containers will be needed SPREADER PREPARATION The spreader to be tested shall b...

Страница 8: ...have a slope of less than two degrees Insert a plastic grid into each of the 21 collection trays Position the 21 collection trays on six foot 6 182 88cm centers with the longest dimension of the tray...

Страница 9: ...addle center collection tray Figure F Set gate opening based on desired rate acre according to theoretical application charts supplied with each unit Drive spreader completely through course at normal...

Страница 10: ...10 HIGHWAY EQUIPMENT COMPANY G4 305438 SP A Page Rev A TEST EQUIPMENT AND PROCEDURES CONTINUED Figure G Spread Chart Example...

Страница 11: ...e effective swath width is consistent with the desired blend If the blend is not consistent a narrower overall swath width should be used and a new optimum driving center effective swath width should...

Страница 12: ...inner blades to a lower numbered hole Light Directly Behind the Vehicle 1 Move the spinner rearward away from conveyor 2 Increase spinner RPM 3 Move one or two spinner blades to a higher numbered hole...

Отзывы: