Coring/Drilling for installation of anchor system
Righting Inverted Units/Inverting Units
Hazard
Precautions to minimise the risk
Actions
Electrocution
Damage to underground
services
Before installation procedure:
Inspect service plans;
Use cable locating equipment and mark the
position of underground apparatus.
Inspect drill & drill bit
Training
Injury to eyes
Use of PPE (goggles)
Training
Injury to ears
Use of PPE (ear defenders)
Training
Dust inhalation
Use of PPE (dusk mask)
Training
Injury to skin from chemical
anchor resin
Use of PPE (gloves)
Training
Injury from traffic
Correct traffic management procedures
followed and operatives to be vigilant
Training
Hazard
Precautions to minimise the risk
Actions
Load slipping
Use certified slings
Use competent slinger
Inspection
Training
Injury to heads
Use of PPE (hard hat)
Instruction
Injury to feet
Use of PPE (steel toe capped safety boots)
Instruction
Injury to legs
Undertake operation in safe restricted area
under control of competent banksman and
crane operator only
Training &
Instruction
Death or injury as a result of
manoeuvring truck
All truck movements under control of
competent banksman
Training
Injury from collision with
passing traffic
Correctly installed traffic management
Training