Position the tower server for operation.
• Server in rack mode:
Slide the server into the rack.
18. Connect all peripheral cables to the server.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
23. Perform the verification and configuration procedures required by the drive option.
For more information, see the drive user guide from the Storage section of the
The installation is complete.
Optical drive cage option
The server supports an optical drive cage option that allows the installation of a 9.5 mm optical drive.
Kit contents
• Optical drive cage
• Optical drive cage screws (2)
• Optical drive SATA-power cable
Installing a SATA optical drive
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Optical drive cage option
◦
Optical drive
◦
Optical drive bracket
◦
Optical drive bracket screws (2)
◦
The SATA-power cable that ships with the drive option will not be used in this server
• T-15 Torx screwdriver
• Phillips No. 1 screwdriver
Procedure
1.
2.
3.
Remove all power:
112
Hardware options installation
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...