
HEWI
Installation-instruction
M1000_123_ES5403_DE-Vers-001.pdf
M1000.123
Page 5 of 8
HEWI P.O. Box 1260 D-34442 Bad Arolsen
3a. De-Installation:
Move the lever with a small screwdriver (or
smthg. similar) and remove the cable.
.
4. Mount the basis-unit onto the socket
using the enclosed screws. Turn the
screws carefully so that the circuit board
doesn’t become distorted. Alternative use
4 screws at the outside fitting-points.
6. Plug the cover onto the wallreader.
After switching on the power-supply, a beep sounds. The red and green LED blink in change
every second. Simultaneously the relays are activated. This is because to ensure the door
opening with non-personalised wall-readers.
For further steps (esp. programming) see the manual of the HEWIKey 5 Administration
software.