8
INSTALLATION
Before handing over the installation to the
customer it is a requirement under Document J the appliance is
lit and the functioning of the chimney system is checked for
satisfactory operation.
x
Be sure that the chimney is operating and ALL smoke and
fumes are vented to the atmosphere through the chimney
terminal.
x
Check all joints and seals.
x
Clean the outside of the appliance to
prevent any stains becoming burnt on.
x
Check the flue draught which should read 1
-
2mmH
2
0, or
0.1
-
0.2 mbar.
x
Explain the controls and operation of the appliance to the
customer.
x
Ensure all aspects of the installation of the stove conform to
current building regulations and the installation is reported
to your local building control department.
FINAL CHECK
Note
-
All local regulation , including those referring to National and European standards need to be
complied with, when installing the appliance. We strongly advise that installation should only be carried
out by a qualified Solid Fuel Heating Engineer, covered by the HETAS scheme , as installation by
non
-
qualified persons may affect the stove operational safety and the product guarantee.
The building Regulations for England and Wales 2000 ref Approved Document J 2010 edition (issued by the
DTLR). The Building Standard (Scotland) (Consolidation) Regulations. Detailed recommendations for
installation of Appliances, chimneys and flues are outlined in the current issue of the following British Standards
BS6461, BS8303 and BS4543
Full details of UK installation regulations can be obtained from the following web site:
-
www.planningportal.gov.uk/uploads/br/BR_PDF_ADJ_2010.pdf
Содержание BK132
Страница 13: ...13 SERVICE MAINTENANCE AX1 Spare Parts...
Страница 14: ...14 SERVICE MAINTENANCE AX2 Spare Parts...