background image

8

INSTALLATION

Before handing over the installation to the 
customer it is a requirement under Document J the appliance is 
lit and the functioning of the chimney system is checked for    
satisfactory  operation.

x

Be sure that the chimney is operating and ALL smoke and 
fumes are vented to the atmosphere through the chimney 
terminal. 

x

Check all joints and seals.

x

Clean the outside of the appliance to
prevent any stains becoming burnt on.

x

Check the flue draught which should read 1 

-

 2mmH

2

0, or   

0.1 

-

 0.2 mbar.

     

x

Explain the controls and operation of the appliance to the 
customer.

x

Ensure all aspects of the installation of the stove conform to   
current building regulations and the installation is reported 
to your local building control department.

FINAL CHECK 

Note 

-

 All local regulation , including those referring to National and European standards need to be 

complied with, when installing the appliance. We strongly advise that installation should only be  carried 
out by a qualified Solid Fuel Heating Engineer, covered by the HETAS scheme , as installation by        
non

-

qualified persons may affect the stove operational safety and the product guarantee.

The building Regulations for England and Wales 2000 ref Approved Document J 2010  edition (issued by the 
DTLR). The Building Standard (Scotland) (Consolidation) Regulations. Detailed recommendations for            
installation of Appliances, chimneys and flues are outlined in the current issue of the following British Standards 
BS6461, BS8303 and BS4543

Full details of UK installation regulations can be obtained from the following web site:

-

www.planningportal.gov.uk/uploads/br/BR_PDF_ADJ_2010.pdf

Содержание BK132

Страница 1: ...PLEASE RETAIN THIS GUIDE FOR FUTURE REFERENCE Operating Installation Manual BK132 Rev 03 August 2011 Part No AFS1574 Multifuel Stoves AX The AX Multifuel Stove Range British Made AX1M S2 AX2M S2...

Страница 2: ...ing the grate 6 Firebox Liner Panels 7 Final Check 8 OPERATION Air wash control 9 Primary air control 9 Multipurpose operating tool Ash pan 10 MAINTENANCE Cleaning the stove 11 Summer Storage 12 Adjus...

Страница 3: ...AS OPERATED BY HETAS IF IN DOUBT CONTACT HETAS LIMITED TELEPHONE NUMBER 0845 634 5626 www hetas co uk THIS STOVE MUST NOT BE CONNECTED TO A SHARED FLUE SYSTEM TO ALL USERS PETROLEUM COKE SOME OF WHOSE...

Страница 4: ...andling the fire x Always grip with the palms of your hands do not use your fingertips for support x Always keep the stove as close to the body as possible as this will minimise the cantilever action...

Страница 5: ...Room Heater Only Output kW 1 4 1 5 Height mm A 458 475 Width mm B 330 370 Depth mm C 323 333 Height to Centre of Rear Flue mm D 370 387 Depth from Back to Centre of Flue mm E 93 5 93 5 Flue Diameter...

Страница 6: ...s below on grate assembly Grate The grates in the AX1 2 stoves comprise of a series of 5 cast iron grate bars seated on a pair of combs All bars in the grate are identical the bar is fitted with the e...

Страница 7: ...ide liner panels See Fig 2 x Fit the throat plate with the projecting lugs sitting on top of the side liners The long centre tab on the back edge rests on the rear liner The shorter turn down tabs aga...

Страница 8: ...ocal building control department FINAL CHECK Note All local regulation including those referring to National and European standards need to be complied with when installing the appliance We strongly a...

Страница 9: ...a single control knob which slides left to right Sliding the knob to the Right see Fig 6 will increase the amount of air intake to the stove To Decrease push the slider to the Left as in Fig 7 AIR WAS...

Страница 10: ...the fire door Fig 10a Operating Tool Ash pan 10 OPERATING INSTRUCTIONS Please Note A stove mitten is supplied with your AX stove Fig 10b this is provided for the operation of the fire door handle and...

Страница 11: ...season It is important that the flue ways flue pipe and chimney be cleaned prior to lighting the appliance after a prolonged shut down period DOOR GLASS The door glass should remain clear during norma...

Страница 12: ...door aperture or catch This is quite normal and due to the settling of the casting The fire door can be re aligned as follows x When the appliance is cold open the fire door so that it is at right ang...

Страница 13: ...13 SERVICE MAINTENANCE AX1 Spare Parts...

Страница 14: ...14 SERVICE MAINTENANCE AX2 Spare Parts...

Страница 15: ...ommence on the date of purchase and are non transferable Our guarantee is offered as an addition to your statutory rights The guarantee is applicable to the original purchaser only and is non transfer...

Страница 16: ...Bars Flue Outlet Hot Plate Fuel Retainer Firebox Liners Throat Plate Air Wash Ash Pan Operating Tool Stove Mitten Operating Installation Manual Assembled By Checked By Arada Ltd The Fire Works Weycro...

Отзывы: