background image

2

Operating instructions Heta vision I, II and III 

INSTALLATION INSTRUCTIONS

            

Safety clearances

Stoves must always be installed in line with 
national and, if applicable, local regulations. 
It is important to abide by local regulations 
regarding setting up chimneys and connec-
tion to same. Therefore, always consult your 
local chimney sweep before installation, as 
you are personally responsible for ensuring 
that the applicable regulations have been 
met.

Distance regulations

A difference applies to installation next to 
flammable and non-flammable walls. If the 
wall is made of non-flammable material 
the stove can, in principle, be placed flush 
against it. However, we recommend leaving 
a gap of at least 5 cm to facilitate cleaning 
behind the stove. The minimum distances to 
flammable material are stated on the boiler 
plate and are listed in the table on page 5.

Warning

 

A stove gets hot. (In excess of 90 

 

degrees). Take care to ensure that  

 

children and elderly or infirm people  

 

cannot come into contact with it.

Combustible materials should not be stored
in the compartment below the ashpan.

IMPORTANT

1. Make sure there is adequate provision to 

sweep the chimney.

2. Make sure there is adequate ventilation to 

the room.

3. Please note that any extraction fans opera-

ting in the same room as the wood-

  burning stove can reduce the chimney 

draft – which may have an adverse effect 
on stove combustion properties. 

  In addition, this may cause smoke to be 

emitted from the stove when the firing 
door is opened.

4. It must not be possible to cover any air 

vents.

The floor

It is essential to ensure that the floor surface 
can actually bear the weight of the stove and 
a top-mounted steel chimney, if applicable. 
The stove must stand on a nonflammable 
surface such as a steel floor plate or a brick 
or tile floor. The size of the nonflammable 
surface used to cover the floor area must 
match national and local regulations.
The wall-mounted Vision III underlying sur-
face is subject to the same regulations.
In addition, the Vision III must be mounted at 
least 7 cm above floor level

            

Congratulations on your new stove. We are sure that 
you will be happy with your investment, especially if 
you follow the advice and instructions we have put 
together in these operating instructions.
The Heta Vision series has been approved according 
to the EN 13240 / NS 3058.
Approval means that consumers can be sure, that the 
stove meets a range of specifications and require-
ments intended to ensure that the materials used are 
of good quality, that the stove does not adversely af-
fect the environment, and hat it is economical to use.
With your new stove you should have received the 
following:
a.  Operating instructions 
b.  Guarantee slip
c.   A stove glove 
d.  Decorative cover
e.  Fireplace set (3 things - not Vision II and III)    
    

Содержание vision III

Страница 1: ...1 Heta vision Design by JACOB JENSEN Operating instructions vision I...

Страница 2: ...d burning stove can reduce the chimney draft which may have an adverse effect on stove combustion properties In addition this may cause smoke to be emitted from the stove when the firing door is opene...

Страница 3: ...result in smoke being emitted from the stove when the door is opened The minimum chimney draft to ensure satisfactory combustion in stoves of this kind is 11 PA However there will still be a risk of...

Страница 4: ...never be shut off Design by JACOB JENSEN Primary air Sekundary air Closed Open Closed Open closed until the stove is cold This is to pre vent the sealing rope sticking to the stove Fuel Your new stove...

Страница 5: ...to ope rate with the door and ashpan closed Stove data table in accordance with EN 13240 testing Operational problems The chimney must be swept at least once a year we recommend the use of a NACS na...

Страница 6: ...he rotary grate and the grate frame Damage resulting from incorrect use Maintenance The surface of the stove has been trea ted with heat resistant paint The stove should be cleaned with a damp cloth A...

Страница 7: ...7 Cleaning after sweeping the chimney and replacing the stones Fig 13 20 Changing to back smoke outlet Fig 5 12 5 6 8 10 12 11 7 9 17 18 16 19 13 14 20 15...

Страница 8: ...8 GB 0037 1056 2009 05 vision II vision III...

Отзывы: