
©2019 Hestan Commercial Corporation
6
EN
BACK AND SUPPORT WALL ASSEMBLY
(continued)
1/4-20 x 1/2” BOLTS
& NUTS HERE
MAIN ELECTRICAL BOX
ROUTE THIS BOX
BETWEEN THIS SPACE.
ATTACH TO THIS WALL ON
2 STUDS AT REAR OF BOX.
ARROWS
POINTING UP
4. Attach support wall #1 to curb assembly and back wall as shown using 6 each 1/4-20 x 1/2” hex
bolts and hex nuts where needed. Do not fully tighten bolts yet. Route the main electrical box as
described below and attach using 2 each 1/4” hex nuts.
5. Install remaining support walls as you did in step 4. Each wall is numbered and has a corresponding
number on the curb and/or rear wall for ease of locating. (8 foot Outdoor Living Suite shown)
Do not fully tighten bolts yet. Note all arrows are pointing up.
Содержание GES08
Страница 22: ...2019 Hestan Commercial Corporation 22 EN RECOMMENDED STONE DIMENSIONS...
Страница 23: ...2019 Hestan Commercial Corporation 23 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 24: ...2019 Hestan Commercial Corporation 24 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 25: ...2019 Hestan Commercial Corporation 25 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 26: ...2019 Hestan Commercial Corporation 26 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 27: ...2019 Hestan Commercial Corporation 27 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 28: ...2019 Hestan Commercial Corporation 28 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 29: ...2019 Hestan Commercial Corporation 29 EN RECOMMENDED STONE DIMENSIONS continued...