
©2019 Hestan Commercial Corporation
18
EN
APPLY SEALANT
ALONG THIS JOINT
HOLE FOR
OPTIONAL BEER
DISPENSER
FOOTRAIL INSTALLATION
(FOR MODELS WITH BAR)
MOUNTING
SCREWS
SETSCREW
1. With a helper’s assistance, install the footrail
brackets on the rear wall as shown using #10-24 x
1/2” long flat-head mounting screws & locknuts
on the opposite side of the wall. Do not fully
tighten the screws yet. There is minimal vertical
adjustment in these brackets to help with uneven
floors.
Check to see if the setscrew in each bracket is
backed out enough to allow the tube to pass
through easily.
NOTE: For installation of the footrail, it is assumed the curb base of the entire suite was
installed on a flat and level concrete or masonry patio surface (see page 4). If the surface
is not level, the bottom pads of each bracket may
not rest fully on this surface. Also if you decide
to tile around the suite after installation, the
bottom pads of the footrail will still be on the same
level as the underside of the curb base. Your tile
installation will need to make allowances for this
condition.
INSTALL COUNTERTOP
NOTE: IF YOU HAVE A SUITE FOR POWER BURNER OR KAMADO GRILL, SEE THE
APPENDIX AT THE BACK OF THIS MANUAL FOR DETAILS BEFORE INSTALLING
THE COUNTERTOP.
5. Install the countertop on top of the plywood sub-structure. Get assistance from another
person to help lift the top and position correctly. The stone itself is usually secured with
an adhesive provided by the stone installer. When complete, apply a bead of clear silicone
sealant along the joint indicated.
Содержание GES08
Страница 22: ...2019 Hestan Commercial Corporation 22 EN RECOMMENDED STONE DIMENSIONS...
Страница 23: ...2019 Hestan Commercial Corporation 23 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 24: ...2019 Hestan Commercial Corporation 24 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 25: ...2019 Hestan Commercial Corporation 25 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 26: ...2019 Hestan Commercial Corporation 26 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 27: ...2019 Hestan Commercial Corporation 27 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 28: ...2019 Hestan Commercial Corporation 28 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 29: ...2019 Hestan Commercial Corporation 29 EN RECOMMENDED STONE DIMENSIONS continued...