
©2019 Hestan Commercial Corporation
19
EN
GAS CONNECTIONS AND FINAL ASSEMBLY
ASSEMBLY OF THE SUITE IS NOW COMPLETE. YOU MAY NOW INSTALL THE APPLIANCES,
CABINETS, AND OTHER PRODUCTS AS PER THE INSTRUCTION MANUALS SUPPLIED WITH
THOSE PRODUCTS.
GAS SUPPLY
Gas connections should be made by a qualified plumber, or your professional outdoor appliance installer.
All fixed (non-mobile) appliances must be fitted with an accessible upstream gas shutoff valve as a means
of isolating the appliance for emergency shut off and for servicing. See reference photo at the end of this
manual.
Make certain new piping and connections have been made in a clean manner and have been purged so that
piping compound, chips, etc. will not clog regulators, valves, orifices, or burners. Use pipe joint compound /
thread sealant approved for natural and LP gases.
NEVER CONNECT THE GRILL OR SIDE BURNER TO AN UNREGULATED GAS SUPPLY. Before
proceeding, ensure the appliance is fitted for Natural or Liquid Propane gas. Connecting to an improper gas
type will result in poor performance and increased risk of damage or injury. Gas type and gas consumption
(BTU per hour) for each burner type is shown on the rating label affixed to each appliance.
Installation of this cooking appliance must be made in accordance with local codes. In the absence of local
codes, this unit should be installed in accordance with the National Fuel Gas Code No.
Z223.1/ NFPA 54,
Natural Gas and Propane Installation code
CSA B149-1, or Propane Storage and Handling Code B149.2.
NOTE: See rating label for manifold pressure for the type of gas of your appliance.
NOTE: If your Suite is to be connected to a Whole-House LP Piped System, please read the GAS
CONNECTIONS section of your Hestan Grill manual for information on this unique installation, and to
contact Hestan Customer Service to order an LP Piped System Kit.
FOOTRAIL INSTALLATION
(continued)
2. Pass the textured tube through
all footrail brackets. Check
that an equal length of tubing is
exposed beyond the left-most
and right-most brackets. When
you are OK with the position,
lock the tube in place with all
setscrews. Tighten all mounting
bracket screws/nuts as well.
3. Attach endcaps to both ends
of the tube and secure with
setscrews on the bottom.
SETSCREW
Содержание GES08
Страница 22: ...2019 Hestan Commercial Corporation 22 EN RECOMMENDED STONE DIMENSIONS...
Страница 23: ...2019 Hestan Commercial Corporation 23 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 24: ...2019 Hestan Commercial Corporation 24 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 25: ...2019 Hestan Commercial Corporation 25 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 26: ...2019 Hestan Commercial Corporation 26 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 27: ...2019 Hestan Commercial Corporation 27 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 28: ...2019 Hestan Commercial Corporation 28 EN RECOMMENDED STONE DIMENSIONS continued...
Страница 29: ...2019 Hestan Commercial Corporation 29 EN RECOMMENDED STONE DIMENSIONS continued...