hesotec electrify eSat r20 Скачать руководство пользователя страница 5

 

Important Information and safety instructions

 

hesotec electrify assumes no liability for the following cases in the event of personal injury or 
property damage: 

  Disregard of the installation and operating instructions 

  Installation of unqualified technical personnel 

  Structural alterations to the charging station 

  Configuration changes of the charge controller 

  Improper handling 

  Use of unauthorized spare parts or accessories 

 

1.3  Safety instructions in this manual 

This manual contains essential information for the installation and commissioning of the 
eSat charging station of hesotec electrify. The following safety instructions are essential to be 
read and followed. 

The warnings contained in this installation and operating manual must be observed with 
great care. The meaning of the individual markings is described below: 

 

Mark 

Meaning 

 

 

DANGER ! 

Safety note on a hazard with electrical voltage 

Non-observance of the instructions may result in electrical damage to the 
device itself, serious injury, and death. 

 

 

ATTENTION ! 

Safety information on a hazard 

Non-observance of the instructions may result in damage to the device 
itself or other consumers. Execution with special care! 

 

 

NOTE ! 

Important information and special features  

For a successful operation, the instructions should be carried out as 
needed. 

 

Содержание eSat r20

Страница 1: ...Installation and operating instruction Charging station electrify eSat for electric hybrid vehicles Type r20 Version 02 2020 2...

Страница 2: ...trify gmbh Rubbertskath 34 46539 Dinslaken GER HR Nr HRB 31112 AG Duisburg St Nr 101 5707 2333 UID Nr DE320783037 Phone 49 0 2064 60 105 60 Fax 49 0 2064 60 105 50 Web electrify hesotec de Mail electr...

Страница 3: ...tage with accessory Foundation Frame 9 3 3 2 Assembly on an alternative Ground 10 3 4 Electrical Installation 12 3 4 1 Electrical Installation of the Charging Station 13 3 4 2 Connection of the digita...

Страница 4: ...ctions To ensure proper installation and safe operation follow the safety instructions given in this manual Improper handling or non compliance with the safety instructions may result in damage to the...

Страница 5: ...of the eSat charging station of hesotec electrify The following safety instructions are essential to be read and followed The warnings contained in this installation and operating manual must be obser...

Страница 6: ...and delivered after successful quality control It is only a secured supply line between the house sub distribution and the charging station needed The respective requirements for the power connection...

Страница 7: ...nt of the charging station hesotec electrify optionally offers a foundation frame which is poured in with concrete With the help of prefabricated bolting points the assembly of the charging column is...

Страница 8: ...harging power 11 kW 22 kW Shutdown All poles Components DC fault current detection electronic I n d c 6mA Load contactor 4 pole with contact monitoring Protection class IP54 Communication Interface WL...

Страница 9: ...fault current detection electronic I n d c 6mA Load contactor 4 pole with contact monitoring Protection class IP54 Energy meter Type PX EEM 357 Communication Interface WLAN LAN Digital Input Protocol...

Страница 10: ...arked vehicle charging cable must not be strained during charging operation No direct spray water Ambient temperature between 25 C and 45 C 13 F and 113 F For installation of low voltage systems the s...

Страница 11: ...r foundation frame Foundation creation with accessory foundation frame After digging the soil shutter the area of the foundation Then insert the foundation frame and guide an empty conduit through the...

Страница 12: ...ective subchapters for the respective assembly steps Make sure that the supply line is de energized at the time of the assembly 3 3 1 Assembly with Montage with accessory Foundation Frame The electrif...

Страница 13: ...st on the base and screw it with the 3 lateral screws similar to DIN 7991 M5x12 A2 3 3 2 Assembly on an alternative Ground The electrify charging station eSat is already preassembled in the factory To...

Страница 14: ...d DIN 912 M8x25 A2 7 Before screwing the charging station to the base read the chapter 3 4 1 Electric installation of the Charging Station 8 After the successful electrical installation place the char...

Страница 15: ...shed These could interfere with the functions in later use cause defects or even cause a fire The following table shows the connection diagram of the connection point between the ground side supply li...

Страница 16: ...ollows 1 Connect the 5 wire cable coming from the ground to the terminal strip according to the terminal label L1 L2 L3 N PE 2 Insert the plug coming in from the charging station into the terminal str...

Страница 17: ...an interface for digital inputs With the digital inputs you have the option of reducing the charging power to 75 50 25 or issuing an external charging release The wiring of the individual inputs is sh...

Страница 18: ...make further settings and evaluations 4 1 Control Element The following graphic shows the main operating elements of the electrify eSat r20 charging station Operating elements of the electrify Chargi...

Страница 19: ...A Charging Station is ready for operation State B Electric vehicle is plugged in State C Charging is active pulsating Wait for authorization via app or RFID card State E There is a fault at the chargi...

Страница 20: ...Sat charging station eSat charging station is ready for operation with green LED indicator 2 Connect the charging plug to the vehicle to be charged After the charging plug is successfully connected to...

Страница 21: ...the vehicle the locking takes place Further information can be found in the operating instructions of the vehicle 3 Authorization by appropri ate RFID card Place the appropriate RFID card on top of t...

Страница 22: ...ly connected to the vehicle the locking takes place Further information can be found in the operating instructions of the vehicle 3 Authorization by app with WLAN connection Connect the mobile phone t...

Страница 23: ...carry out independently Disorder Possible Cause Troubleshooting The LED indicator of the eSat charging station does not light up The Residual Current Device R C D has tripped Check in the subdivision...

Страница 24: ...at the time of repair Non observance of the safety instructions can lead to a risk of mortal danger due to electrical voltage Repairs to the charging station may only be carried out by a qualified spe...

Страница 25: ...tec electrify recommends carrying out a test at intervals of 6 months Charging Station Check the charging station for visual damage and defects Check the functionality of the charging socket Check if...

Страница 26: ...and Declaration of Conformity The electrify eSat charging station of hesotec electrify is marked with a CE label A copy of the Declaration of Conformity will be presented later On request this is ava...

Страница 27: ...Notes 24 8 Notes...

Страница 28: ...hesotec electrify gmbh Rubbertskath 34 46539 Dinslaken GER Phone 49 0 2064 60 105 60 Fax 49 0 2064 60 105 50 Mail electrify hesotec de Web electrify hesotec de...

Отзывы: