background image

Operating instructions 

6

 

Phone +49 4531 509-0 

 

Type 

d

 

[mm] 

Pressure 
range   
[bar] 

Max. 
back 
pressure 
[%] 

Temperature   
[°C] 

Medium 

06602 

12.5 

1.2 to 1.3 

3% 

-10 °C to +130 °C 

See 
section 
"4.5 
Media" 

06603 

0.2 to 5.0 

-10 °C to +180 °C 

50051.0004 

7.0 

6.0 to 15.0 

-10 °C to +160 °C 

50051.0011 

7.0 

1.5 to 5.0 

-10 °C to +160 °C 

 

4.5 

Media 

Type 

Medium 

06205 
06216/06217 
06218/06219 

Non-toxic steams and gases 

06370 

Non-adhesive liquids 

06372 

Steams and gases 

06376 

Non-toxic, incombustible liquids 

06380 

Non-toxic steams and gases 

06395 

Steams and gases 

06500 
06505/06506 

Liquid, grainy, dusty media 

06602/06603 

Steams and gases 

50051.0004 

Steams, gases and liquids that 
are specially intended for heavy 
oil and lubricants in the 
shipping, offshore and industrial 
environments 

50051.0011 

Steams and gases 

4.6 

Materials 

  See catalogue page. 

4.7 

Scope of delivery 

  Safety valve. 

  Operating instructions. 

4.8 

Dimensions and weights 

  See catalogue page. 

4.9 

Lifetime 

The user is obligated to use Herose products for their intended purpose. 
In this case, a technical service life may be assumed in accordance with the underlying product standards 
(e.g. EN1626 for shut-off valves and EN ISO 4126-1 for safety valves). 
The technical service life can be restarted several times through the exchange of wearing parts within the 
context of the maintenance intervals, and lifetimes of more than 10 years can be achieved. 
If products are stored for a period exceeding 3 years, then the synthetic material components and 
elastomer sealing elements fitted to the product should be replaced as a precautionary measure before 
mounting and use. 

Содержание 06205

Страница 1: ...HEROSE GMBH ARMATUREN UND METALLE Operating instructions Safety valve for industrial applications...

Страница 2: ......

Страница 3: ...oe Germany Phone 49 4531 509 0 Fax 49 4531 509 120 E mail info herose com Web www herose com 3rd issue 01 2020 The transmission or duplication of this document and the use or communication of its cont...

Страница 4: ...Phone 49 4531 509 0 Table of contents 1 About these instructions 1 2 Safety 1 3 Transport and storage 3 4 Description of the safety valve 4 5 Assembly 7 6 Operation 9 7 Maintenance and service 10 8 Di...

Страница 5: ...instructions see section 4 5 Media Operating conditions and applications deviating from these require the approval of the manufacturer Only media may be employed to which the materials used for the va...

Страница 6: ...all work on the safety valve 2 5 Additional equipment and spare parts Additional equipment and spare parts not conforming to the manufacturer s requirements can negatively affect the operational safet...

Страница 7: ...ibed protective equipment Secure the discharge area NOTICE Impermissible stresses arising from operating conditions and extensions added structures Safety valve body leaking or broken Provide suitable...

Страница 8: ...n individual marking for identification Symbol Explanation e g G1 2 Connection size PN Rated working pressure max permissible operating pressure Manufacturer s mark HEROSE e g 1 4301 Material no e g 0...

Страница 9: ...ticle 2 section 4 or the rules and standards of the American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code Section VIII Division I 4 4 Operational data Type d0 mm Pressure range...

Страница 10: ...shipping offshore and industrial environments 50051 0011 Steams and gases 4 6 Materials See catalogue page 4 7 Scope of delivery Safety valve Operating instructions 4 8 Dimensions and weights See cat...

Страница 11: ...stalled in a horizontal position 06602 06603 The safety valves can be installed vertically or in a horizontal installation position with the outlet facing downwards 50051 0004 Vertical 50051 0011 The...

Страница 12: ...710 2 940 1100 1300 06370 06372 06380 CC491K 1 2 35 80 70 3 4 50 110 110 1 110 250 220 11 4 170 390 390 11 2 220 550 530 2 360 890 980 CC480K 1 2 35 80 70 3 4 50 110 110 1 110 250 220 11 4 170 390 390...

Страница 13: ...mounting and installation work are completed Compare the material pressure temperature and installation position with the layout plan for the pipework system Dirt and residues have been removed from...

Страница 14: ...uctions 7 2 1 Inspection and maintenance intervals Recommended intervals Inspection Interval Scope Inspection During start up Visual inspection of the angle valve for damage of the valving marking for...

Страница 15: ...y or at all Attach water drain according to regulations Constantly blowing off Spring corroded by impermissible medium and broken Replace the safety valve System pressure too high Replace the safety v...

Страница 16: ...ail service herose com Fax 49 4531 509 9285 8 Disassembly and disposal 8 1 Notices regarding the disassembly Take note of all national and local safety requirements The pipework system must be depress...

Отзывы: