HEROSE 06205 Скачать руководство пользователя страница 14

Operating instructions 

10

 

Phone +49 4531 509-0 

 

Maintenance and service 

7.1 

Safety during cleaning 

  Take note of the specifications in the safety data sheet and the general occupational health and 

safety rules if degreasers are used for process-related reasons for the cleaning of bearing parts, 
unions and other precision parts. 

7.2 

Maintenance 

The maintenance intervals must be defined by the user according to the operating conditions. 
The recommendations for the functional checking of the safety valves are to be taken from section 7.2.1 
"Inspection and maintenance intervals" in these operating instructions. 

7.2.1 

Inspection and maintenance intervals 

Recommended intervals 

Inspection 

Interval 

Scope 

Inspection 

  During start-up 

  Visual inspection 

  of the angle valve for 

damage; 

  of the valving marking for 

legibility; 

  for absence of damage to 

the sealing. 

  Leak-tightness 

  Union of the valve seat; 

  If existent, actuation of the lifting 

device. 

Functional testing 

  Annually 

  If present, test of lifting device 

including visual inspection. 

External inspection 

  Every 2 years 

  Function and tightness test 

including visual check.  

Internal inspection 

  Every 5 years 

  Replacement of all sealing 

elements by the manufacturer 
including functional, tightness 
test and visual check. 

Hydraulic test 

  Every 10 years 

  Replacement of all sealing 

elements by the manufacturer 
including functional, leak-
tightness, pressure test and 
inspection. 

 

Содержание 06205

Страница 1: ...HEROSE GMBH ARMATUREN UND METALLE Operating instructions Safety valve for industrial applications...

Страница 2: ......

Страница 3: ...oe Germany Phone 49 4531 509 0 Fax 49 4531 509 120 E mail info herose com Web www herose com 3rd issue 01 2020 The transmission or duplication of this document and the use or communication of its cont...

Страница 4: ...Phone 49 4531 509 0 Table of contents 1 About these instructions 1 2 Safety 1 3 Transport and storage 3 4 Description of the safety valve 4 5 Assembly 7 6 Operation 9 7 Maintenance and service 10 8 Di...

Страница 5: ...instructions see section 4 5 Media Operating conditions and applications deviating from these require the approval of the manufacturer Only media may be employed to which the materials used for the va...

Страница 6: ...all work on the safety valve 2 5 Additional equipment and spare parts Additional equipment and spare parts not conforming to the manufacturer s requirements can negatively affect the operational safet...

Страница 7: ...ibed protective equipment Secure the discharge area NOTICE Impermissible stresses arising from operating conditions and extensions added structures Safety valve body leaking or broken Provide suitable...

Страница 8: ...n individual marking for identification Symbol Explanation e g G1 2 Connection size PN Rated working pressure max permissible operating pressure Manufacturer s mark HEROSE e g 1 4301 Material no e g 0...

Страница 9: ...ticle 2 section 4 or the rules and standards of the American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code Section VIII Division I 4 4 Operational data Type d0 mm Pressure range...

Страница 10: ...shipping offshore and industrial environments 50051 0011 Steams and gases 4 6 Materials See catalogue page 4 7 Scope of delivery Safety valve Operating instructions 4 8 Dimensions and weights See cat...

Страница 11: ...stalled in a horizontal position 06602 06603 The safety valves can be installed vertically or in a horizontal installation position with the outlet facing downwards 50051 0004 Vertical 50051 0011 The...

Страница 12: ...710 2 940 1100 1300 06370 06372 06380 CC491K 1 2 35 80 70 3 4 50 110 110 1 110 250 220 11 4 170 390 390 11 2 220 550 530 2 360 890 980 CC480K 1 2 35 80 70 3 4 50 110 110 1 110 250 220 11 4 170 390 390...

Страница 13: ...mounting and installation work are completed Compare the material pressure temperature and installation position with the layout plan for the pipework system Dirt and residues have been removed from...

Страница 14: ...uctions 7 2 1 Inspection and maintenance intervals Recommended intervals Inspection Interval Scope Inspection During start up Visual inspection of the angle valve for damage of the valving marking for...

Страница 15: ...y or at all Attach water drain according to regulations Constantly blowing off Spring corroded by impermissible medium and broken Replace the safety valve System pressure too high Replace the safety v...

Страница 16: ...ail service herose com Fax 49 4531 509 9285 8 Disassembly and disposal 8 1 Notices regarding the disassembly Take note of all national and local safety requirements The pipework system must be depress...

Отзывы: