I
NSTALLATION AND
A
SSEMBLY
18
8.2 Assembly instruction
No.
Diagram
Description
Material requirements
1
•
Packaging units
1x
Platform main body
1x
Cantilever set
2
•
Screw in hose barb
1x
Hose barb 1/2"
3
•
Connect
platform-sided
hose line
1x
Rubber hose 16mm
1x
Rubber hose 8mm
1x
Hose connector 6mm
2x
Hose clamp 10-16
1x
Hose clamp 16-25
4
•
Connect
platform-sided hose line.
•
Connect pneumatic line
(provided by the
customer)
1x
Operator control module
1x
Hose clamp 10-16
1x
Hose clamp 16-25
5
•
Run in cantilever 1
1x
Cantilever
1x
platform main body
Содержание HLS 1200-13
Страница 2: ...2...
Страница 36: ...ADDITIONAL INFORMATION 36 Proposal 1...
Страница 37: ...ADDITIONAL INFORMATION 37 Proposal 2...
Страница 38: ...ADDITIONAL INFORMATION 38 Notes...
Страница 39: ...ADDITIONAL INFORMATION 39 Notes...