background image

8 •                                                             Important: Always read and follow instructions.

Operation

ALWAYS make sure the 525 Tire Lift is not 
touching the wheel assembly before using 
the wheel balancer. Personal injury or dam-
age to the unit could result if neglected.

         

             

ALWAYS make sure to hold the wheel assy 
UPRIGHT any time the wheel/tyre assem-
bly is on the WHEEL TRAY.Personal injury or 
damage to the unit could result if neglected.
Do not leave WHEEL Lift in raised position 
and in contact WITH WHEEL before initiat-
ing Wheel Balancing cycle

Before moving the WHEEL TRAY, make sure 
the BASE TRACK area is clear of debris.

 525 Light Duty Lift Operation

1.

 Actuate the PEDAL to lower; making sure the 

WHEEL CARRIER/TRAY is completely lowered before 

loading.

2.

 Use foot to slide the WHEEL TRAY to align with 

the WHEEL RAMP.

3.

 Roll the wheel assembly to load it onto the 

WHEEL TRAY.

4.

 Actuate the PEDAL to raise the wheel assembly; 

centering it with the balancer stub shaft.

5.

 Hold the wheel assembly upright while sliding 

the WHEEL TRAY left until the wheel assembly is on 

the balancer stub shaft, ready to be mounted on the 

balancer.

6.

 Secure the wheel to the balancer using suitable 

mounting adapters.

7.

 Actuate the PEDAL to fully lower the WHEEL 

TRAY/CARRIER,ensuring the WHEEL TRAY clears the 

balancer chassis during movement.

8.

 Balance the wheel.

9. 

Loosen and remove the hubnut, and any accesso-

ries blocking the removal of the wheel assembly.

10.

 Actuate the PEDAL to raise the WHEEL TRAY/

CARRIER.

11.

 Move the WHEEL TRAY left under the wheel 

assembly.

•  Do not activate the lift when the tire/wheel 

assembly is rigidly attached. Ensure the lift 
does not apply any lifting force on the bal-
ancer shaft.

•  Damage can occur to the balancer and the 

balancer can be lifted off its original position.

12.

 Actuate the PEDAL so the WHEEL TRAY will 

support the wheel assembly as it lifts.

13.

 Remove the wheel assembly from the balancer 

stub shaft.

14.

 Hold the wheel assembly upright and slide the 

WHEEL TRAY back away from the balancer.

15.

 Actuate the PEDAL to lower the WHEEL.

16.

 Unload the wheel assembly by rolling it out of 

the WHEEL TRAY.

Содержание coats 525

Страница 1: ...e machine for ease of reference by supervisors and operators Safety Instructions Setup Instructions Operating Instructions Maintenance Instructions with Parts Identification 1601 J P Hennessy Drive La...

Страница 2: ...r 800 688 6359 www hennessyind com Definitions of Hazard Levels Identify the hazard levels used in this manual with the following definitions and signal words DANGER Watch for this symbol It Means Imm...

Страница 3: ...e avoided Tight fitting leather gloves are recommended to protect operator s hands when han dling worn tires and wheels Sturdy leather work shoes with steel toes and oil resistant soles should be used...

Страница 4: ...your own protection NOTIFY THE CARRIER AT ONCE if any hidden loss or damage is discovered after receipt and ask the car rier to make an inspection If the carrier will not do so prepare a signed statem...

Страница 5: ...or unload a tire wheel assembly to or from the 525Tire Lift 5 WHEEL RAMP Use to load or unload a tire wheel assembly to or from the 525 Tire Lift 6 SCISSOR FEATURE Use to raise lower the TOP TRACK 7...

Страница 6: ...unpack the box as fig 2 shown and remove all side walls Figure 2 Unpack the box remove all side walls 2 Remove 2 screws as fig 3 shown then slide the PEDAL BOX ASSY along the direction as the arrow sh...

Страница 7: ...against the rear wall of the BASETRACK as shown fig 8 tighen the 2 bolts Figure 8 Bolt PEDAL BOX ASSY to BASE TRACK 8 Remove the bolt to let WHEEL TRAY move free fig 9 Figure 9 Remove the bolt 9 Inser...

Страница 8: ...wheel assembly upright while sliding the WHEEL TRAY left until the wheel assembly is on the balancer stub shaft ready to be mounted on the balancer 6 Secure the wheel to the balancer using suitable mo...

Страница 9: ...uires minimal mainte nance to ensure correct functional performance and smooth operation Keep the BASE TRACK area that the CARRIAGE slides on clean and clear of debris Wheel weights debris and hand to...

Страница 10: ...k 23 NS 85611658 Base track weldment 24 85611665 Screw Shoulder 12mmx30mm 25 85611667 Ramp 26 85611672 Cylinder 80mm 27 NS 85611680 Top track weldment 28 NS 85611682 Plate scissor weldment 29 85611684...

Страница 11: ...Important Always read and follow instructions 11 A A A A B B C C 15 15...

Страница 12: ...85611991 00 12 2020 Copyright 2020 Hennessy Industries LLC...

Отзывы: