2
Contents
1 Please observe the following
..................................................................................................
4
1.1 Emphasised Sections ........................................................................................................ 4
1.2 Items Supplied .................................................................................................................. 4
1.3 Field of Application (Intended Usage) .............................................................................. 4
1.4 For Your Safety ................................................................................................................. 5
2 Technical Data
.................................................................................................................
6
3 Description
.......................................................................................................................
6
3.1 Theory of Operation ......................................................................................................... 6
3.2 Machine Overview ........................................................................................................... 7
3.3 Machine Connections ....................................................................................................... 8
3.4 Touchscreen Menus ......................................................................................................... 9
4 Installation
..................................................................................................................... 12
4.1 Environmental and Operating Conditions ..................................................................... 12
4.2 Levelling the Printer ....................................................................................................... 12
4.3 Connecting the Supplies ................................................................................................. 12
4.4 Removing the Projector Cap .......................................................................................... 12
4.5 Asssembling the Build Platform ..................................................................................... 12
4.6 Assembling the Basins .................................................................................................... 13
4.7 Installing the Safety Basin .............................................................................................. 14
4.8 Installing the Resin Basin ................................................................................................ 16
4.9 Run the Diagnostics Check ............................................................................................. 17
4.10 Positioning the Build Platform ....................................................................................... 19
4.11 Alligning the Build Platform ........................................................................................... 20
5 Loctite Operator Station PC Software
..........................................................................
23
5.1 Installing the Software ................................................................................................... 23
5.2 Main Screen.................................................................................................................... 24
5.3 Adding a Printer ............................................................................................................. 31
6 Calibration
......................................................................................................................
32
6.1 Create a Calibration Print ............................................................................................... 32
6.2 Print a Calibration Print .................................................................................................. 32
6.3 Measure the Calibration Values ..................................................................................... 33
7 Operation
.......................................................................................................................
34
7.1 Create a Print Job ........................................................................................................... 34
7.2 Preperations Before Printing.......................................................................................... 34
7.3 Printing ........................................................................................................................... 34
7.4 Remoiving the Build Platform ........................................................................................ 35
7.5 Cleaning the Build Platform ........................................................................................... 36
Содержание Loctite EQ PR10.1 DLP
Страница 1: ...Loctite EQ PR10 1 DLP 3D Printer Operating Manual IDH 2416987 ...
Страница 8: ...8 3 3 Machine Connections 21 Power Connector 22 Ethernet Connector 21 22 ...
Страница 11: ...11 The job can be deleted by swiping left on the Planned Jobs screen To begin printing press the Start button ...
Страница 40: ...40 ...