STEP 9:
Affix floor brackets to floor, ensuring correct alignment using spirit level (using screw C). Secure noggins
into place using screw B. Fit 102N guide. (See page 5 for positioning detail)
NOTE: Use spirit level
to check alignment
*Uprights
removed
for clarity
Floor/wall bracket
295mm noggin
Double Upright
Assembly x 2
EVOPRO10 only.
*Uprights
removed
for clarity
EVOPRO10
CONFIGURATION
295mm Noggins are used
to bridge the double
upright assemblies and
secure them to the end of
the cavity (rough
opening) with the
floor/wall brackets
provided.
Screw C
Screw C
Screw B