
NETLink
®
PRO family Application Examples
14
4
INAT-OPC-Server (INAT GmbH)
The following steps must be performed in the described se-
quence (status May 2008):
4.1
Configuring the INAT OPC server
The following dialog box opens when you select “
Configura-
tion->AccessPathDefinition
” from the menu:
A new connection is generated via menu “
Configuration->New”
in dialog box “
Access Path Definition
”.
The following dialog box opens.
When you have confirmed the new connection with the OK
button, you can set the parameters in the subsequent dialog
box: