Hekatron FSZ Pro Скачать руководство пользователя страница 23

23

9 Electrical Installation   

ON

Buffering 24 V activated - (FSZ Pro with ESM Pro)

Only the 24 V supply voltage is buffered until the energy store is emptied. 
This means that in the event of a power failure, the smoke switches will continue to 
be supplied with power and devices connected to relay 1, such as the acoustic/optical 
signaling device (ROLP).  
The alarm can be forwarded externally via relay 2.  
When the operating voltage fails, the internal piezo is controlled simultaneously and 
signals the power failure acoustically. 
The fault mains failure or operation via ESM Pro is indicated via the fault LED (yellow). 
When the alarm storage function is switched on, a manual reset must always be carried 
out after the mains voltage returns, regardless of during discharging the ESM Pro or 
after discharging the ESM Pro. 
If this is done, all relays are energized again, the THM is energized again, the fault LED 
and the piezo go out again.  
The 24 V supply voltage is reactivated when the mains voltage is switched on. 
When the alarm storage function is switched off, the relays switch when the voltage 
returns, regardless of whether during discharging the ESM Pro or after discharging the 
ESM Pro, the THM switches on again, the 24 V supply voltage is reactivated, the fault LED 
and the piezo switch off.

Example buffer times:

 When using 6 ORS 142 smoke switches and a optical and acoustic signal 

device ROLP, the ESM Pro provides a buffer of typically 25 seconds.

Содержание FSZ Pro

Страница 1: ...www hekatron de Control unit for hold open systems FSZ Pro Edition 19 09 2018 7003067 Instruction manual...

Страница 2: ...2...

Страница 3: ...FSZ Pro applications 13 9 Electrical Installation 14 9 1 Installation instruction 14 9 2 Control unit FSZ Pro for hold open systems 16 9 3 Termination module AM 142 19 9 4 FSZ Pro operation 20 9 5 Ho...

Страница 4: ...ctional test 38 11 4 Annual testing and maintenance 38 11 5 Functional test 39 11 6 Maintenance 40 11 7 Obligatory documentation requirement 40 12 Annex 41 12 1 Order data 41 12 2 Drilling template 41...

Страница 5: ...r changes to the equipment are not permitted The equipment must be used only for its intended purpose in an undamaged and perfect condition No other spare parts than those available from the manufactu...

Страница 6: ...abelled T r schlie en Close door and Tor schlie en Close gate 1 x termination module AM 142 3 Warranty In case of non compliance with the information contained in this Instruction Manual any claims fo...

Страница 7: ...an be switched on or off optionally Additional relay with a potential free alternating contact for free use Common features FSZ Pro and FSZ Basis Integrated manual release button conforming to standar...

Страница 8: ...hing voltage DC Switching current at 30 V DC Switching current at 24 V DC 2 alternating contact potential free max 250 V AC max 5 A AC max 30 V DC max 3 A DC max 5 A DC Sound volume piezo internal typ...

Страница 9: ...signal white according to RAL 9003 Installation exposed assembly Installation position as desired Cable entries 6 x M16 und 2 x M20 Dimensions HxWxD 146 mm x 146 mm x 60 5 mm Weight with without ESM P...

Страница 10: ...425 2 x 63 mA 126 mA Total current requirements 192 mA The total current must not exceed 900 mA The current consumption of the various components of the hold open system is specified in the related pr...

Страница 11: ...s as a guide for the groove in the printed circuit board of the ESM Pro Figure 2 Place the ESM Pro on the printed circuit board as shown Fig 2 Figure 3 Make sure that the contact pins Fig 3 are insert...

Страница 12: ...d dowels The installation position can be selected as desired The FSZ accessories kit which must be ordered separately includes two mounting adapters for installation of the FSZ Pro in a switch cabine...

Страница 13: ...be activated via DIP switch 3 EN 14637 One termination module AM 142 or a magnet for ORS 142 must each be connected in the last detector to be connected and in the manual button see Fig 7 resp Fig 8 I...

Страница 14: ...cted with regard to electrical engineering An interrupter circuit breaker max 10 A tripping characteristic B must be installed in the supply circuit The place of installation of the interrupter must b...

Страница 15: ...section of the power supply cord must not exceed 2 5 mm Hold open system wiring Recommended line type without smoke switch in combination with a smoke status indicator switch status indicator IY ST Y...

Страница 16: ...nection terminals Connection of ext manual release and reset button Mains connection 230 V AC Potential free alternating contact Connection of smoke switch Terminal points Connection of hold open syst...

Страница 17: ...potential free contact 3 Relay line voltage NO Closed when system in operation 24 V Output voltage 24 V DC GND Output voltage 0 V DC ORS Feedback from ORS alarm loop K Connection point terminal B Con...

Страница 18: ...nce is switched off the inputs for the external manual button and the external alarm input must be bridged when not in use When line monitoring is switched on see pages 28 29 und 30 the input of the e...

Страница 19: ...M 142 connection Coming from the power supply unit or the second to last smoke switch Going to the last smoke switch 24 V yellow feedback alarm loop GND white feedback alarm loop connected internally...

Страница 20: ...t ohne Hupe with without horn O N 3 2 1 6 5 4 Fig 4 DIP switches for FSZ Pro configuration Alarm storage DIP 1 OFF The FSZ Pro does not store an incoming alarm If the releasing smoke switch resets its...

Страница 21: ...Z Pro is used according to DIN EN 14637 this DIP switch must be set to ON If the FSZ Pro is used according to DIBt the system can be used with and without line surveillance Irrespective of the type of...

Страница 22: ...itched off all relays are energised again the THM is energised and the fault LED and the piezo remain off The 24 V supply voltage is switched on again If the alarm storage is switched on all relays an...

Страница 23: ...rm storage function is switched on a manual reset must always be carried out after the mains voltage returns regardless of during discharging the ESM Pro or after discharging the ESM Pro If this is do...

Страница 24: ...m forwarding is not prevented If the horn has not been deactivated an alarm is always acoustically signalled at the FSZ Pro The magnet output is always switched off OFF Silent alarm OFF ON Silent alar...

Страница 25: ...Class 3 Frequent use by the public and other persons with a low inclination to care and diligence i e cases where misuse is probable to a certain degree Digit 2 Stress test of the hold open device Cl...

Страница 26: ...ing 9 6 1 Connection without line surveillance DIP 3 OFF The system is operated with a smoke switch stub an external manual release button and an external reset button S L HAT ORS TDS 1 3 2 BUS 6 5 4...

Страница 27: ...e FACP The manual button must be simulated by a jumper ORS TDS 1 3 2 BUS 6 5 4 ORS TDS 1 3 2 BUS 6 5 4 ORS TDS 1 3 2 BUS 6 5 4 FACP O N 3 2 1 6 5 4 L N PE 24V GND ORS K B THM THM 24 V HAT RESET GND FS...

Страница 28: ...switch 3 must be set to ON To prevent a short circuit remove the red and black connection wires S L HAT AM 142 ORS TDS 1 3 2 BUS 6 5 4 AM 142 O N 3 2 1 6 5 4 RD BK WH YE RD BK WH YE L N PE 24V GND ORS...

Страница 29: ...n must be simulated by an AM 142 To prevent a short circuit remove the red and black connection wires L N PE 24V GND ORS K B THM THM 24 V HAT RESET GND FSZ Pro THM x AL_IN AL_IN 4 5 6 1 2 3 3 Line sur...

Страница 30: ...s 2 and 3 must be set to ON To prevent a short circuit remove the red and black connection wires L N PE 24V GND ORS K B THM THM 24 V HAT RESET GND FSZ Pro THM x AL_IN AL_IN 4 5 6 1 2 3 3 Line surveill...

Страница 31: ...a power failure the optical acoustic alarm device signals until the ESM Pro is discharged L N PE 24V GND ORS K B THM THM 24 V HAT RESET GND FSZ Pro THM x AL_IN AL_IN 4 5 6 1 2 3 3 Line surveillance EN...

Страница 32: ...nces to indicate the different statuses Every flashing sequence starts with a long pulse 1 5 sec followed by a short pause 0 5 sec Fig 12 If flashing sequences comprise several pulses the long pulse i...

Страница 33: ...l release button fault of termination module AM 142 ON OFF Flashes 3 x OFF OFF Alarm Externer alarm input Alarm of an external alarm device e g a fire alarm system ON ON OFF OFF OFF Fault at FSZ Pro F...

Страница 34: ...ule and rewire HAT ON Flashes 4 x OFF OFF OFF Excess temperature in FSZ Pro Ambient temperature too high Reduce the ambient temperature install cooling if necessary ON Flashes 5 x OFF OFF OFF Fault in...

Страница 35: ...also contain at least the following information Z No of the building type approval used Designation of the object of the general building type approval Name and address of the contract firm Designati...

Страница 36: ...Engineering in the course of the general building type approval procedure The acceptance test must at least include the following items 1 It must be verified that the built in devices and device comb...

Страница 37: ...4 FAX 07634 500 323 Abnahme durch Firmenzeichen sowie Monat und Jahr der Abnahme Feststellanlage Fig 14 A certificate of successful acceptance testing shall be issued to the operator it shall be kept...

Страница 38: ...adequate instruction this functional test can be carried out by any person on their own responsibility special qualification are not required Scope results and time of the monthly respectively quarte...

Страница 39: ...cular hold open system c Restoration of the fire detectors from the alarm state d Check whether there are environmental effects which affect the proper functioning of the installed hold open system e...

Страница 40: ...of the hold open system according to the manufacturer s specifications e g fire detectors accumulators and or batteries d Check whether the hold open system is triggered in the event of a power failu...

Страница 41: ...ination module 142 AM 142 31 5700002 01 xx Magnet line surveillance QUP 10 31 4100015 01 xx Servicing and maintenance set IW Set RS 7001949 Slide in unit FSZ QUP 10 english 31 6800001 01 xx Slide in u...

Страница 42: ...2 Annex 12 3 Technical support and application support Hekatron Vertriebs GmbH Phone 49 0 76 34 5 00 8050 Br hlmatten 9 Mailto rs support hekatron de D 79295 Sulzburg V S d Werk 2 Z x x xxxx Z 6 510 2...

Страница 43: ...lications 13 Functional test 39 G General safety information 5 H Hold open control unit 7 Horn 7 Horn OFF 21 I Installing the FSZ Pro 12 IW Set 40 L LED 33 Line length 15 Line surveillance 21 M Mainte...

Страница 44: ...44...

Страница 45: ...45 128 128 36 36 8 Bohrschablone Textanker...

Страница 46: ...46...

Страница 47: ...47...

Страница 48: ...Hekatron Vertriebs GmbH Br hlmatten 9 D 79295 Sulzburg Techn Support 49 0 7634 500 8050 A company of rs support hekatron de Securitas Gruppe Schweiz www hekatron de...

Отзывы: