Heiniger TPW Aussie Xpress Скачать руководство пользователя страница 6

MA005 TPW Woolpress Operator Manual  

 

2019-06-06

 

 

Rev:05 

5

 

Guarantee 

5.1

 

Introduction    

HEINIGER Australia guarantee the 'TPW Woolpress" manufactured by them to be free from 
defect in workmanship and materials. Their obligations pursuant to this guarantee are 
limited to the repair or replacement of parts and workmanship which prove defective within 
the specified period. 
The repair or replacement shall be affected upon the defective equipment being returned 
freight pre-paid to the registered office of HEINIGER Australia or New Zealand or when 
authorised to the authorised Service Agents. 
All travelling costs incurred by Service Agents performing repairs under warranty will be the 

owner’s

 responsibility. 

Where HEINIGER Australia supplies goods not manufactured by HEINIGER Australia, the 
customer shall only be entitled to such benefits as HEINIGER Australia may receive under 
guarantee as given to HEINIGER Australia by the manufacturer of those goods. 
Some parts not covered by HEINIGER Australia 
Hydraulic Cylinder, Hydraulic hoses, Electric motor, Hydraulic pump assembly, Hydraulic 
control valve, Starter switch, Scale components. 
(These parts generally have to be sent back to the manufacturer for warranty inspection 
and assessment) 

 

5.2

 

Guarantee period on parts manufactured by HEINIGER Australia 

Primary producers:    

25 months from the date of delivery. 

Contractors:    

 

12 months from the date of delivery. 

 

5.3

 

Conditions    

This guarantee will be invalidated for any of the following reasons: 
1.

 

If notice of the defect is not given to HEINIGER Australia or New Zealand within the 
guarantee period. 

2.

 

If the woolpress has been subject to misuse, abuse, negligence or accident. 

3.

 

If the woolpress is installed, maintained or operated in any manner other than that for 
which it is designed. 

4.

 

If the woolpress is used for any duty or subjected to any abnormal operating conditions 
varying from that for which it is supplied by HEINIGER Australia. 

When making a warranty claim or ordering new parts, it is important that the serial number 
of the unit is quoted and the date of purchase stated.  

 

6

 

Technical data 

 

6.1

 

Dimensions 

Height operational:   

2705mm 

 

Height shipping:  

 

1970mm 

Box height:    

 

1185mm 

 

Length:  

 

 

1390mm 

Width:  

 

 

970mm 

 

Weight: 

 

 

530kg 

 

6.2

 

Electric 

Motor:  

 

 

Teco Induction 

Electric:  

 

 

4kw (5.5hp), 415V, 3Ø, 1440rpm 

Electric:  

 

 

2.2kw (3hp), 240V or 480V at 1460rpm 

Electrical operating voltage and current: 
Nominal  

Min Volts  

Return stroke  

Full load 

Volts    

Full load  

Current  

 

Current 

240 V   

220 V   

11.0A   

 

16.0A 

480 V   

440 V   

6.0A    

 

8.0A 

415 V   

 

 

8.0A   

 

8.0A 

 

Содержание TPW Aussie Xpress

Страница 1: ...T TP PW W W WO OO OL LP PR RE ES SS S Operator manual for models Aussie Xpress Kiwi Xpress Read before operating Manufactured by HEINIGER AUSTRALIA...

Страница 2: ...sembly 9 Jockey wheel 10 Woolpress operation 11 Weighing system 11 1 Scale operation 11 2 Weighing modes 11 3 System care 11 4 Span calibration procedure 11 5 Avoid overweight bales 11 6 Mechanical co...

Страница 3: ...k Place Hornby Christchurch T 64 3 349 8282 F 64 3 349 8292 E mail heiniger co nz W www heiniger com HEINIGER Australia 5 Devon Street Lonsdale SA 5163 T 61 8 8326 0890 2 Safety 2 1 Safety Notice HEIN...

Страница 4: ...ng this woolpress tie back long hair The safe guards fitted to this woolpress must be kept in proper condition The safe guards must be fitted and operational before using this woolpress Children are n...

Страница 5: ...transport skids whenever practicable when transporting the woolpress Ensure that there is no load on the load cell or wheels and the hydraulic cylinder is lowered A Woolpress Trolley is available to...

Страница 6: ...y have to be sent back to the manufacturer for warranty inspection and assessment 5 2 Guarantee period on parts manufactured by HEINIGER Australia Primary producers 25 months from the date of delivery...

Страница 7: ...ds With 220 V or 440 V 13 seconds 20 seconds low power supply 6 6 Weighing system Make Iconix FX1 Indication LCD Power supply 12V DC Load sensing Single load cell Zero facility Automatic zero tracking...

Страница 8: ...If 3 phase check motor rotation If incorrect an electrician should reverse If an extension lead must be used it must be a 20 amp lead Avoid leads longer than 10m 4 Cut the cable ties that fasten the p...

Страница 9: ...n the bellcranks and baling pins are lubricated fit the pinning guards see illus 19 Start the woolpress and cycle it a few times to expel any air which may be trapped in the hydraulic system 9 Jockey...

Страница 10: ...t interruption When the platen is returning it will automatically lift the guard Note If the pressing chamber of the press is not full of wool when the press is cycled the pack may get pushed into the...

Страница 11: ...es Free mode is automatically selected at switch on The display is continuously updated with the weight currently on the scale Hold mode A press of the WEIGH key switches the scale to hold mode which...

Страница 12: ...ales only to 190 195kg so that bales do not exceed 204kg 11 6 Mechanical considerations The following are the requirements which are necessary for the electronic scales to perform as they are intended...

Страница 13: ...he pinning guards are routinely removed for maintenance They must be replaced securely before the press is used 12 2 General maintenance Ensure the motor is switched off and the power disconnected whi...

Страница 14: ...n matter or has been overheated then the oil will need changing more frequently 12 6 Filter change Change the oil filter and tank filler breather cap every 2000 hours of operation This is an approxima...

Страница 15: ...ight hand it is advisable to back off wind up the adjustment bolt on the top of the left hand guide rod before proceeding 1 Send the platen on the down stroke and allow the pins to go in Carefully wat...

Страница 16: ...s prematurely leaving the baling pins partially in the bin while the wool is being pressed possibly resulting in damage to the press or woolpack Unpinning clearance illustration 12 11 Hydraulic pump o...

Страница 17: ...cure both problems in most cases 2 High pressure adjustment lock nuts minimum stop the positioning of this setting determines the flow once the press is in the second stage Adjustments of the lock nut...

Страница 18: ...stalls Overload Check power supply Second stage on pump Check low pressure adjustment not activated compensator on pump Page 17 Second stage flow Adjust high pressure minimum stop capacity too high a...

Страница 19: ...psi reset Pump not coming in on Check low pressure adjustment Page 17 second stage Seals worn or damaged Replace or repair on ram piston Voltage supply too low Check your local supply current overloa...

Страница 20: ...MA005 TPW Woolpress Operator Manual 2019 06 06 Rev 05 20 14 General layout illustration...

Страница 21: ...MA005 TPW Woolpress Operator Manual 2019 06 06 Rev 05 21 15 Side view...

Страница 22: ...MA005 TPW Woolpress Operator Manual 2019 06 06 Rev 05 22 16 Lubrication points illustration...

Страница 23: ...MA005 TPW Woolpress Operator Manual 2019 06 06 Rev 05 23...

Страница 24: ...MA005 TPW Woolpress Operator Manual 2019 06 06 Rev 05 24...

Страница 25: ...uarantee conditions see the owner s manual Return the tear off section of this card completed within seven days of purchase to effect warranty period Return this section to HEINIGER Australia 5A Tayet...

Отзывы: