
Quadra-Chek
®
QC100
2-9
First-time users should thoroughly understand the preceding por-
tions of this chapter before operating the QC100. The operating
instructions assume a basic familiarity with the process of measur-
ing features, QC100 controls and indicators and the information
presented on LCD screens.
NOTE
NOTE
NOTE
NOTE
NOTE
It is assumed that operators have a basic understanding of
It is assumed that operators have a basic understanding of
It is assumed that operators have a basic understanding of
It is assumed that operators have a basic understanding of
It is assumed that operators have a basic understanding of
part fixturing and the geometric probing techniques required
part fixturing and the geometric probing techniques required
part fixturing and the geometric probing techniques required
part fixturing and the geometric probing techniques required
part fixturing and the geometric probing techniques required
for their coordinate measuring devices.
for their coordinate measuring devices.
for their coordinate measuring devices.
for their coordinate measuring devices.
for their coordinate measuring devices.
Location and mounting
Location and mounting
Location and mounting
Location and mounting
Location and mounting
Verify that the QC100 is mounted on a stable reliable surface. If it
should fall, it could become seriously damaged or cause injuries
to the user.
PPPPPower cord and plug
ower cord and plug
ower cord and plug
ower cord and plug
ower cord and plug
The power cord should not be located where it can be walked on
or create a tripping hazard. Always connect the 3-wire power
plug to a 3-wire grounded outlet. Use of a 2-wire power plug
adapter or any other connection accessory that removes the third
grounded connection creates a safety hazard and should not be
permitted.
PPPPPower surge suppressor
ower surge suppressor
ower surge suppressor
ower surge suppressor
ower surge suppressor
A high-quality power surge suppressor should be used to limit the
amplitude of potentially damaging power line transients caused
by the operation of heavy electrical machinery or lightning.
Liquids
Liquids
Liquids
Liquids
Liquids
Do not spill or splash liquids on the QC100 enclosure.
Configuration and system setup
Configuration and system setup
Configuration and system setup
Configuration and system setup
Configuration and system setup
System configuration and setup should be performed only by tech-
nically qualified supervisors or dealer representatives. Operators
should not attempt to alter the configuration of the QC100.
Preparing for
operation
Safety and other reminders
Safety and other reminders
Safety and other reminders
Safety and other reminders
Safety and other reminders
Содержание QUADRA-CHEK 100
Страница 1: ...English en 9 2013 ND 1100 QUADRA CHEK QC 100 Operating Instructions...
Страница 2: ......
Страница 3: ...Quadra Chek 100 User s Guide...
Страница 38: ...Chapter 2 Operation 2 18...
Страница 74: ...Chapter 4 Setup 4 32...
Страница 81: ...734 641 01 A 02 9 2013...