HP105 Plasma arc voltage height controller
第
- 11 -
页 共
23
页
3. installation and commissioning
3.1 Work process:
When CNC system’s output arc signal to the HP105’s interface J2-4
,
the height controller should process the IHS firstly; Secondly
auto-control the Arc-on, the height controller will send the signal of
arc transfer and pierce transfer to the NC system after producing
the transfer arc. At the mean time, the controller delay time to put
the arc voltage into the single chip system. If “Auto Permitted is
available in height controller and NC system has sent out AUTO
height adjusted signal, the controller is on status of “Height Auto
adjusted”
ATTN: When the cNC system that you use can not receive the
signal of arc-on and pierce, please delay the time to control the NC
system’s running. It just means that the cNC system send arc-on
signal to the height controller, delay time to run the cNC system.
3.2 INSTALLATION CONTROLER
:
The following section provides you with the procedure to follow
when installing the HP105 Some of the steps direct you to other
sections in this manual that provide you with more detailed
instruction.