L SEALER OPERATION 

Due  to  the  various  types  and  gauges  of  shrink  films,  the  sealing  temperature  control  will  require  adjustment  to  obtain  the 
optimum  setting  for  the  film  being  sealed.  Always  use  the  minimum  setting  that  will  provide  a  satisfactory  seal  to  achieve 
maximum sealing wire and/or knife blade life and minimize replacement of Non-Stick tape and sealing pads. 

 

SHRINK TUNNEL OPERATION 

As with the L sealer, the various types and gauges of films will require some experimenting with the temperature setting of the 
shrink tunnel and the conveyor speed to obtain the desired shrink. 

Because some time is required for the tunnel chamber to adjust to a temperature setting change, it is recommended that the 
conveyor speed adjustment be used to change the time exposure of the package to the available heat for shrinking. If after 
achieving the desired shrink of the package the conveyor is running too slow for required production, increase the temperature 
setting of the chamber. 

When the chamber has stabilized, increase the conveyor speed. It is recommended that for the most economical operation, the 
tunnel temperature be maintained at the lowest setting compatible with the shrink film being used and your rate of production. 

OPERATING PROCEDURES 

Содержание HSE-100

Страница 1: ...READ ALL INSTRUCTIONS CAREFULLY BEFORE OPERATING EQUIPMENT Revised 2019 OPERATING MANUAL HSE 100 COMBINATION SHRINK SYSTEM...

Страница 2: ...eliminary Setup Adjustments 6 Threading the Film Adjusting the Sealing Platform Operating Procedures 8 L Sealer Operation Shrink Tunnel Operation Machine Controls Adjusting the Sealing Cycle Wrapping...

Страница 3: ...is included with your system UNPACKING THE SYSTEM The HSE 100 system is a unitized shrink wrapping machine that combines an L Bar Sealer with a Shrink Tunnel Your system is shipped fully assembled wi...

Страница 4: ...eal Conveyor Platform Adjustment Casters Non Stick Mesh Tunnel Conveyor Shrink Tunnel BASIC SPECIFICATIONS Film Capacity 17 Wide Sealing Area 16 W 20 L Working Height 36 H With Leg Kit Inside Tunnel D...

Страница 5: ...with a standard perforating roller for venting the film The perforating roller 2 is used to make a series of small holes continuously as the film is being drawn from the roll during normal packaging o...

Страница 6: ...corner of the sealing area 3 then loosen the knobs 4 under the film cradle and position the cradle so that the folded edge of the film is even with the back of the package to be wrapped 5 Re tighten t...

Страница 7: ...ability under loads To change platform positions STATIC PLATFORM AND ROLLER TRAY The platform position is easily changed by inserting fingers in holes 3 and after lifting slightly slide platform to th...

Страница 8: ...the shrink tunnel and the conveyor speed to obtain the desired shrink Because some time is required for the tunnel chamber to adjust to a temperature setting change it is recommended that the conveyor...

Страница 9: ...rm down Dwell Time 0 2 seconds The amount of time the seal arm is held down after the seal time has expired and seal wire has de energized Conveyor Speed 0 10 seconds Controls the speed both the tunne...

Страница 10: ...film margin on the side and front of the package about 2 inches for adequate shrink The sealing arm is lowered into position 6 which actuates the sealing cycle The two open sides of the film are seale...

Страница 11: ...kages See your Heat Seal Price List for replacement part information RECOMMENDED CLEANING L BAR SEALER SEALING WIRES Clean daily Use a soft brass wire brush SEALING PADS Clean daily Wipe clean with a...

Страница 12: ...rew 1 Then insert the other end of the wire into the hole on the tensioning screw 4 leaving the wire loose Use a 1 8 Allen Key on the screw head 5 and a 3 8 wrench on the lock nut 6 to tighten the wir...

Страница 13: ...WIRE INSULATION CHECK AND CLEAN KNIFE BLADE CHECK CONDITION OF SEALING PADS CHECK CONDITION OF NON STICK TAPE CHECK FOR EVEN ARM AND MAGNET PRESSURE CHECK THE MINIMUM SEALING TEMPERATURES INCREASE TH...

Страница 14: ...TURE PROBLEM BURN HOLES HOT SPOTS SOLUTION CHECK THE CONDITION OF THE AIR RELEASE HOLES SPEED UP THE TUNNEL CONVEYOR DECREASE THE TUNNEL CHAMBER TEMPERATURE PROBLEM ERRATIC SHRINK SOLUTION MAKE SURE T...

Страница 15: ...15 Revised 2019...

Отзывы: