Wiring Centre
UFH
PUMP
Model:
UH6
Model:
UH6
OFF ON
1
2
3
4
5A FUSE
MAINS SUPPLY
TIMECLOCK
ZONE 1
ZONE 2
ZONE 3
ZONE 4
ZONE 5
ZONE 6
UFH
RAD
L
L
N
N
L
N
E
LS
LS
LR
LR
L
N
E
L
N
E
L
L
N S/L
HEAT
UFH PUMP
DELAY
SETTING
L
L
N
N
L
L
N
N
L
L
N
N
L
L
N
N
L
L
N
N
HEAT
SOURCE
L
N S/L
L
N S/L
L
N S/L
L
N S/L
L
N S/L
CONNECT UP TO 4 ACTUATORS
PER ZONE, AS SHOWN HERE
LS & LR CONNECTIONS
ARE VOLT FREE
EARTH
NEUTRAL
EARTH
LIVE
SWITCH LIVE
END SWITCH
or HEAT ENABLE
WIRING KEY
This equipment should be installed by an appropriately qualified/registered electrician.
Fully read the instructions for proper wiring before applying power.
The warranty does not cover damage from improper wiring or installation.
RADIATOR
ZONE VALVE
(WITH END
SWITCH)
UH6 - NEOSTAT 6 ZONES WITH TIME CLOCK
(5 X UFH, 1 X RADIATOR ZONE)
MAINS
SUPPLY
N A1 A2 - RT
L
14
UFH Zone
UFH Zone
UFH Zone
UFH Zone
Radiator Zone
UFH Zone
N A1 A2 - RT
L
N A1 A2 - RT
L
N A1 A2 - RT
L
N A1 A2 - RT
L
N A1 A2 - RT
L
Содержание UH6
Страница 1: ...Model UH6 Compact Wiring Centre...
Страница 18: ...Wiring Centre 17 Notes...
Страница 19: ...Model UH6 Model UH6 18 Notes...