
en
59
HeatMaster TC :
664Y6800 • A
EN
FR
NL
ES
IT
DE
PL
RU
MAINTENANCE
REMOVING AND CLEANING THE CONDENSATE RECOVERY DISH
(HM TC EQUIPPED WITH A RECIRCULATION COPPER TUBE)
Set-up conditions
•
Boiler shut down.
•
External power supply isolated.
•
Gas supply closed.
•
Primary circuit of boiler drained, see "Draining
the boiler", page 60.
•
Hydraulic circuits (DHW and primary) isolated
•
Lower front panel and base open
Procedure
Make sure that the primary circuit of the
boiler has been completely drained of
water before starting the procedure.
1. Remove and clean the ball condensate trap.
2. Disconnect the lower couplings.
3. Disconnect the flue gas sensor.
4. Remove the flue pipe elbow.
5. Disconnect the copper tube located between
the charging pump and the condensate recovery
dish.
6. Remove the condensate recovery dish and clean it.
7. Replace the condensate recovery dish gaskets
8. Reinstall the condensate recovery dish and reconnect all the previously disconnected items, in
the oposite order as that mentioned in steps 2 to 5. Make sure to replace the seals and gaskets as
required.
Follow-up tasks
1. Reinstall the condensate trap, see "Boiler preparation", page 41
2. Restart the boiler according to procedure, "Restarting after maintenance", page 61
Содержание 120 TC
Страница 63: ...en 63 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU DECLARATION OF CONFORMITY EC ...
Страница 64: ...en 64 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU DECLARATION OF CONFORMITY EC ...
Страница 65: ...en 65 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...
Страница 66: ...en 66 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...
Страница 67: ...en 67 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...
Страница 68: ...MARKINGS LABELS en 68 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...