
en
48
HeatMaster TC :
664Y6800 • A
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
GAS CIRCUIT CONNECTION
5.
Remove the gas valve from the venturi (
4
) by releasing 3 screws. Retain the screws for reinstallation.
6.
Install the cover plate (
6
) in the center of the O-ring (
5
).
Make sure you position the O-ring correctly.
7.
Reassemble the gas valve/venturi assembly, following the same procedure in reverse order, and
tighten the 3 gas valve screws and the 2 venturi screws with a torque of 3.5 to 4 Nm.
8.
Stick the sticker provided with the conversion kit on the boiler and check the box to indicate the
type of gas to be now used with the boiler.
Follow-on tasks
•
Adjust parameters 22 to 28 of MCBA (See the System Control manual)
•
Carry out the CO
2
adjustment, (see "Checking and adjusting the burner")
Before carrying out the CO
2
adjustment, it is important to adjust the fan speed
parameters (See the System Control manual of the boiler).
Содержание 120 TC
Страница 63: ...en 63 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU DECLARATION OF CONFORMITY EC ...
Страница 64: ...en 64 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU DECLARATION OF CONFORMITY EC ...
Страница 65: ...en 65 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...
Страница 66: ...en 66 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...
Страница 67: ...en 67 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...
Страница 68: ...MARKINGS LABELS en 68 HeatMaster TC 664Y6800 A EN FR NL ES IT DE PL RU ...