Heatilator • CD4236IFTR, CD4236IFTLR, CD4842IFTR, CD4842IFTLR Installation Manual • 2511-980 Rev. M
• 8/21
2
Safety Alert Key:
• DANGER!
Indicates a hazardous situation which, if not avoided will result in death or serious injury.
• WARNING!
Indicates a hazardous situation which, if not avoided could result in death or serious injury.
• CAUTION!
Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
• NOTICE:
Used to address practices not related to personal injury.
Note:
The term “recommend” or “recommended” does not indicate a requirement. It is a best practice suggested by
Hearth & Home Technologies
®
.
Table of Contents
Installation Standard Work Checklist . . . . . . . . . . . . . . . . . . . .
3
1 Product Specific and Important Safety Information
A. Appliance Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
B. Glass Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
C. BTU Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . . .
4
E. Non-Combustible Materials Specification. . . . . . . . . . . . . .
4
F. Combustible Materials Specification . . . . . . . . . . . . . . . . .
4
G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
H. California . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
I. Requirements for the Commonwealth of Massachusetts . .
5
2 Getting Started
A. Design and Installation Considerations . . . . . . . . . . . . . . .
6
B. Good Faith Wall Surface . . . . . . . . . . . . . . . . . . . . . . . . . .
6
C. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . .
6
D. Inspect Appliance and Components . . . . . . . . . . . . . . . . . .
7
3 Framing and Clearances
A. Appliance/Decorative Front Dimension Diagrams . . . . . . .
8
B. Clearances to Combustibles . . . . . . . . . . . . . . . . . . . . . .
12
C. Constructing the Appliance Chase . . . . . . . . . . . . . . . . . .
14
D. Floor Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14
4 Termination Location and Vent Information
A. Vent Termination Minimum Clearances . . . . . . . . . . . . . .
15
B. Vent Terminal Clearances . . . . . . . . . . . . . . . . . . . . . . . .
16
C. Approved Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17
D. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
E. Measuring Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
F. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20
5 Vent Clearances and Framing
A. Pipe Clearances to Combustibles . . . . . . . . . . . . . . . . . .
33
B. Wall Penetration Framing/Firestops . . . . . . . . . . . . . . . . .
33
C. Ceiling Firestop/Floor Penetration Framing . . . . . . . . . . .
34
D. Install Attic Insulation Shield . . . . . . . . . . . . . . . . . . . . . . .
34
6 Appliance Preparation
A. Vent Collar Preparation . . . . . . . . . . . . . . . . . . . . . . . . . .
35
B. Installing Optional Heat Management Systems . . . . . . . .
37
C. Securing and Leveling the Appliance . . . . . . . . . . . . . . . .
38
D. Installing the Non-combustible Board. . . . . . . . . . . . . . . .
38
7 Venting and Chimneys
A. Assemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . .
39
B . Assemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . .
40
C. Assemble Slip Sections . . . . . . . . . . . . . . . . . . . . . . . . . .
41
D. Secure the Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . .
42
E. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . .
42
F. Vertical Termination Requirements . . . . . . . . . . . . . . . . . .
43
G. Horizontal Termination Requirements . . . . . . . . . . . . . . .
44
8 Electrical Information
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
46
B. Wiring Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .
47
9 Gas Information
A. Fuel Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49
B. Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49
C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . .
49
E. Air Shutter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
50
10 Finishing
A. Facing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
51
B. Mantel and Wall Projections . . . . . . . . . . . . . . . . . . . . . . .
52
C. Facing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
53
D. Decorative Fronts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
53
11 Appliance Setup
A. Remove Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . .
56
B. Remove the Shipping Materials . . . . . . . . . . . . . . . . . . . .
56
C. Clean the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
56
D. Install the Refractory (Optional) . . . . . . . . . . . . . . . . . . . .
56
E. Ember Placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
57
F. Place the Lava Rock and Vermiculite . . . . . . . . . . . . . . . .
57
G. Install the Log Assembly. . . . . . . . . . . . . . . . . . . . . . . . . .
58
H. IntelliFire Touch
®
Control System Setup
. . . . . . . . . . . . . .
60
I. Install Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . .
60
J. Fiber Refractory Color Review . . . . . . . . . . . . . . . . . . . . .
60
12 Reference Materials
A. Vent Components Diagrams . . . . . . . . . . . . . . . . . . . . . .
61
B. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
73
= Contains updated information.