A waterless condensate trap kit is included for the drain system.
Traps must be
installed in the vertical position only,
with the float located above the spring. Never
install horizontally.
For outdoor installations, route condensate drain directly from duct furnace into
building as shown in the following Figures.
Condensate Drain Connections for Outdoor Installation
Roof Curb
Furnace flue
collector box
Furnace cabinet base
¾” PVC Elbow
(by others)
¾” PVC Pipe to reach to
inside of building (by others)
¾” PVC Union
(by others)
EZ Trap cleanout
(provided with trap kit)
¾” PVC
Coupling
EZ Trap (EZT150)
(provided with trap kit)
¾” PVC Pipe to Building
drain system (by others)
Apply heat tape to all
pipe and fittings
outside building