Heat & Glo • 350TRSI-AUF, 350TRSILP-AUF • 2089-980 Rev. T • 3 /14
120º
Figure 10.8 Securing Vertical Pipe Sections
120º
Figure 10.9 Securing Horizontal Pipe Sections
E. Disassemble Vent Sections
• Rotate either section (see Figure 10.10) so the seams
on both pipe sections are aligned as shown in Figure
10.11.
• Pull carefully to separate the pieces of pipe.
D. Secure the Vent Sections
• Vertical runs orginating off the top of the appliance, with no
offsets, must be supported every 2,44 m (8 ft.) after maximum
allowed 7,62 m (25 ft.) of unsupported rise.
• Vertical runs originating off the rear of the appliance or
after any elbow, must be supported every 2,44 m (8 ft.).
• Horizontal runs must be supported every 1,52 m (5 ft.).
• Vent supports or plumbers strap (spaced 120º apart)
may be used to support vent sections. See Figures 10.8
and 10.9.
• Wall shield fi restops may be used to provide horizontal
support vent sections.
• SLP ceiling fi restops have tabs that may be used to
provide vertical support.
WARNING! Risk of Fire, Explosion or Asphyxiation!
Improper support may allow vent to sag and separate.
Use vent run supports and connect vent sections per in-
stallation instructions. DO NOT allow vent to sag below
connection point to appliance.
Figure 10.11 Align and Disassemble Vent Sections
Figure 10.10 Rotate Seams for Disassembly