Heat-N-Glo CFX-DA Скачать руководство пользователя страница 15

17

!

C. Vent Termination

For Horizontal Terminations -

 The trapezoidal cap DVK-

01TRD is the only cap that is approved to terminate a
horizontal vent run.

For Horizontal Terminations -

 To attach and secure the

termination to the last section of horizontal vent:

• Rotate and interlock the ends as described at the begin-

ning of the Installing Vent Components section.

• The termination kit should pass through the wall firestops

from the exterior of the building.

• Adjust the termination cap to its final exterior position on

the building.

WARNING: THE TERMINATION CAP MUST BE
POSITIONED SO THAT THE ARROW IS

POINTING UP.  THE HEAT SHIELD PROVIDED WITH
THE UNIT (SHIPPED INSIDE ONE OF THE STAND-
OFFS ON TOP OF THE UNIT) MUST BE USED TO
PROTECT THE VINYL SIDING ABOVE THE CAP.

!

WARNING:  THE BOTTOM OF THE VENT
TERMINATION CAP MUST BE A MINIMUM

OF 12 INCHES (305 MM) ABOVE GROUND LEVEL
(GRADE). THE TOP OF THE CAP MUST BE A MIN-
IMUM OF 18 INCHES (457 MM) BELOW COMBUS-
TIBLE MATERIAL, SUCH AS A DECK. THE SIDE
OF THE CAP MUST BE A MINIMUM OF 6 INCHES
(152 MM) AWAY FROM A PARALLEL OUTSIDE
WALL. VENTING TERMINALS SHALL NOT BE RE-
CESSED INTO A WALL OR SIDING. SEE FIGURE
19 FOR VENT TERMINATION CLEARANCES.

Figure 18.  Heat Shield

Trapezoid Cap
Termination

  Heat Shield

Figure 17. Trapezoid Termination Cap

7 1/4”

(184mm)

HEAT

SHIELD

Figure 15.  Ceiling Firestop (Ceiling Side)

If the area above the ceiling is 

NOT

 an attic, position and

secure the ceiling firestop on the ceiling side of the previously
cut and framed hole.

If the area above the ceiling

IS

 an attic, position and secure

the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least
1 inch (25mm).

Figure 16.    Attic Firestop

JOIST

CEILING FIRESTOP

CEILING

NAILS (4 REQUIRED)

CEILING

CEILING FIRESTOP

RAFTER

NAILS (4 REQUIRED)

Fasten heat shield and firestop simultaneously. See Figures
17 and 18.

For trapezoidal cap termination kits:

• Using screws secure the heat shield along with the

cap to the exterior wall through the flanges in the cap
(Figure 18).

• Seal the joint between the pipe and the exterior firestop.

• Screw the heat shield to the top of the cap. Figure 18.

Содержание CFX-DA

Страница 1: ...writers Laboratories Listed 514 900G 9 02 READ THIS MANUAL BEFORE INSTALLING OR OPERATING THIS APPLIANCE THIS INSTALLERS GUIDE MUST BE LEFT WITH APPLIANCE FOR FUTURE REFERENCE PleasecontactyourHeat N...

Страница 2: ...DERSTAND all instructions carefully before starting the installation FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty Prior to the firs...

Страница 3: ...vals 12 B Installing Vent Components 15 C Vent Termination 17 Step 4 Positioning Leveling and Securing the Fireplace 20 Step 5 The Gas Control Systems 20 Step 6 The Gas Supply Line 21 Step 7 Gas Press...

Страница 4: ...2 1 Canadian Electric Code in Canada These models may be installed in a bedroom or bed sitting room in the U S A and Canada Approvals and Codes High Altitude Installations U L Listed gas fireplaces ar...

Страница 5: ...Termination Kits as indicated in this guide for exhausting flue gases AND model AK CFX Air Kit for combustion air See venting section for details The Heat N Glo Warranty will be voided by and Heat N...

Страница 6: ...2 977mm 34 1 2 876mm 3 3 8 86mm 5 3 4 146mm GAS LINE ACCESS 19 3 4 501mm 11 5 8 294mm 11 1 16 281mm 22 1 8 562mm 8 5 8 219MM 3 3 8 86mm 5 3 4 146mm 15 1 8 384mm 4 3 4 121mm ELECTRICAL ACCESS 35 889mm...

Страница 7: ...combustible construction Constructing the Chase A chase is a vertical box like structure built to enclose the gas fireplace and or its vent system Vertical vents that run on the outside of a building...

Страница 8: ...g A B C D 43 750 REF Step 2 Framing the Fireplace Fireplace framing can be built before or after the fireplace is set in place Framing should be positioned to accommo date wall coverings and fireplace...

Страница 9: ...AP 1 3 8 INCHES 34 93 mm AT EACH JOINT DV 36D 5 3 4 146mm 8 3 4 222mm 11 3 4 298mm DV 12D DV 09D DV 06D DV 48D DV 90D 7 3 8 187mm 6 5 32 156mm 11 5 8 295mm 11 15 16 303mm 5 7 8 149mm 8 5 8 220mm 8 1 2...

Страница 10: ...Guide Termination Kits Vent Components HEAT SHIELD DVK TVCD DVK 01TRD HORIZONTAL TERMINATION WALL FIRESTOP 90 DEGREE ELBOW VERTICAL TERMINATION STORM COLLAR ROOF FLASHING HORIZONTAL PIPE SUPPORT PIPE...

Страница 11: ...ertical run of 40 feet maximum could be introduced at any point of the horizontal run and even right off the top of the unit Total H Horizontal run 50 feet maximum Total V Vertical run 40 feet maximum...

Страница 12: ...14 Figure 8 Straight Up Vertical Venting STRAIGHT UP VERTICAL VENTING V FT 40 MAX 12 4 M CAP V...

Страница 13: ...tical axis If an el bow does not end up in a locked position with the pre ceding component attach with a minimum of two 2 sheet metal screws Figure 10 Adding Venting Components 3 Install Support Brack...

Страница 14: ...bove the center of the horizontal vent pipe For Vertical Runs One ceiling firestop is REQUIRED at the hole in each ceiling through which the vent passes To install firestops for vertical runs that pas...

Страница 15: ...H AS A DECK THE SIDE OF THE CAP MUST BE A MINIMUM OF 6 INCHES 152 MM AWAY FROM A PARALLEL OUTSIDE WALL VENTING TERMINALS SHALL NOT BE RE CESSED INTO A WALL OR SIDING SEE FIGURE 19 FOR VENT TERMINATION...

Страница 16: ...APS IT IS STRONGLY RECOMMENDED WHENEVER POSSIBLE TO USE THE VINYL PROTECTOR KIT 30 minimum for vinyl clad soffits a vent shall not terminate directly above a sidewalk or paved driveway which is locate...

Страница 17: ...FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS PROVIDED THE TERMI NATION CAP IS AT LEAST TWO 2 FEET FROM A VERTICAL WALLAND 2 FEET BELOW AHORIZON TAL OVERHANG NOTE This also pertains to vertical vent systems...

Страница 18: ...on level and secure the fireplace Figure 21 Proper Positioning Leveling and Securing of a Fireplace Figure 22 Gas Control System Step 5 The Gas Control System WARNING THIS UNIT IS NOT FOR USE WITH SOL...

Страница 19: ...pe and outer casing Step 6 The Gas Supply Line NOTE Have the gas supply line installed in accordance with local building codes by a qualified installer approved and or licensed as required by the loca...

Страница 20: ...MUST SILICONE THE HOLE IN THE FIBER BOX TO SEAL IT FROM THE OUTSIDE HIGH TEMPERATURE 300o F OR 149o C MINIMUM SEALANT Optional Accessories Optional remote control kits require that 110 120 VAC be wire...

Страница 21: ...ANT MATE RIAL MUST BE USED THESE JOINTS ARE NOT RE QUIRED TO BE SEALED ONLY NON COMBUSTIBLE MATERIAL USING 300 F MINIMUM ADHESIVE IF NEEDED CAN BE APPLIED AS FACING TO THE FIRE PLACE SURROUND SEE THE...

Страница 22: ...ccompany the logs Save the log instructions with this manual If sooting occurs the logs might need to be repositioned slightly to avoid excessive flame impingement Adjusting the Ignitor Air Deflector...

Страница 23: ...nes to purge themselves of this air Once the purging is complete the fireplace will light and will operate normally Subsequent lightings of the fireplace will not require this purging of air from the...

Страница 24: ...vacuum the control compartment fireplace logs and burner areas surrounding the logs Checking Flame Patterns Flame Height Frequency Periodically By Qualified service technician Home owner Task Make a...

Отзывы: