Install the outdoor unit on a rigid base to prevent increased noise levels and vibration.

Ensure the air outlet is not blocked by any objects such as plants or walls, etc.

If the installation location is exposed to strong winds, ensure the unit is placed lengthwise along 

the wall or provide a switchable baffle to block strong wind gusts from entering the unit.

If suspending the unit with a bracket, follow the bracket manufacturer’s installation instructions.

Use a raised concrete pad or concrete blocks to provide a solid base and level surface - securely

anchor the unit down with bolts. See table & figure below.

In a snowy area, install the outdoor unit on a raised platform higher than drifting snow.

Seal

Drain elbow connector

Base pan hole

of outdoor unit

(A)

(B)

              The pictures of the drain joint may very from the actual 

part that come with the unit.

Push the seal onto the end of the drain elbow connector (Fig. A), 

then insert the drain elbow connector into the hole in the bottom 

of the base pan of the unit (Fig. B) until it makes a click sound 

and is firmly in place. Add an additional drain hose to direct the 

condensate away from the base of the unit by placing a hose  

on the end of the hose barb. This drain hose is not included with  

the unit and must be purchased.

2

DRAIN JOINT INSTALLATION

OUTDOOR INSALLATION PRECAUTION

1

NOTE: 

Anchor the outdoor unit with a bolt and nut  

( 10mm) or 

 tightly and horizontally 

on a concrete or rigid mount.

Ø3/8” Ø

Ø5/16”(Ø8mm)

Outdoor  unit  dimension

          in(mm)(L1xHxW1)

L2(mm)

20.6in.(523)

W2(mm)

13.4in.(340)

20.9in.(530)
23.6in.(600)

11.4in.(290)
12.6in.(320)

22.1in.(560)
23.2in.(590)

18.9in.(481)

13.2in.(335)
13.1in.(333)

10.9in.(276)

Mounting  dimensions

32.3x23.4x13.0

29.9x23.2x11.2

30.5x21.4x12.2

33.3x27.6x12.6
35.4x33.9x12.4

26.4x21.3x9.8

Settlement of outdoor unit

(820x595x330)

(760x590x285)

(775x545x310)

(845x700x320)
(900x860x315)

(670x540x250)

OUTDOOR SECTION

Содержание VMH 30 Series

Страница 1: ...ontroller Inc 1900 Wellworth Ave Jackson MI 49203 517 787 2100 www heatcontroller com INSTALLATION OPERATION MAINTENANCE MANUAL Inverter Single Zone Ductless Mini Split Heat Pump VMH 30 36 Series Vers...

Страница 2: ...LE IN THE WALL CONNECTIVE PIPE AND DRAINAGE INSTALLATION CONNECTING THE COMMUNICATION CABLE OUTDOOR SECTION OUTDOOR INSALLATION PRECAUTION DRAIN JOINT INSTALLATION REFRIGERANT PIPE CONNECTION CONNECT...

Страница 3: ...on cycle explosion and injury 8 Do not modify the length of the power supply cord or use an extension cord and do not share the single outlet with other electrical appliances Otherwise it may cause fi...

Страница 4: ...ndoor unit Outdoor unit If an awning is built over the unit to prevent direct sunlight or rain be careful that heat radiating from the condenser is not obstructed There should not be any animals or pl...

Страница 5: ...ith 2 55in 65mm hole core drill 3 Drill the piping hole at either the right or the left and the hole should be slightly slanted to the outdoor side 4 Always use wall hole conduit when drilling metal g...

Страница 6: ...nsulate both the auxiliary piping Be sure that the drain hose is located at the lowest side of the bundle Locating at the upper side can cause drain pan to overflow inside the unit Never intertwine th...

Страница 7: ...onditioner must be available 6 HCI recommends the use of 600V THHN 14 AWG 4 conductor unshielded stranded copper cable however NEC always prevails Electrical work Connect the cable to the indoor unit...

Страница 8: ...nt may very from the actual part that come with the unit Push the seal onto the end of the drain elbow connector Fig A then insert the drain elbow connector into the hole in the bottom of the base pan...

Страница 9: ...lbf 19 17 265kgf cm ft lbf Flaring Tightening connection U N I T Oblique O 90 Roughness Burr Bar Copper pipe Clamp handle Handle Bar A Indoor unit tubing Flare nut Pipings 4 1 Remove the electrical co...

Страница 10: ...gas side 2 Connect the charge hose connection to the vacuum pump 3 Fully open the handle of the manifold valve 4 Operate the vacuum pump to evacuate After starting evacuation slightly loose the flare...

Страница 11: ...e AUTO or COOL the unit will operate under Forced AUTO or COOL mode see User Manual for details 4 The manual test operation should last about 30 minutes giving the installing contractor an opportunity...

Страница 12: ...10 24 2012...

Отзывы: