![Heat Controller DMH18DB-1 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/heat-controller/dmh18db-1/dmh18db-1_service-manual_2115758018.webp)
18 Multi type Air Conditioner
Flaring Work and Connection of Piping
Flaring work
Main cause for gas leakage is due to defect in flaring work. Carry out correct flaring work in the following procedure.
Cut the pipes and the cable.
1. Use the piping kit accessory or the pipes purchased
locally.
2. Measure the distance between the indoor and the out-
door unit.
3. Cut the pipes a little longer than measured distance.
4. Cut the cable 1.5m (5.0ft) longer than the pipe length.
Burrs removal
1. Completely remove all burrs from the cut cross section
of pipe/tube.
2. Put the end of the copper tube/pipe in a downward
direction as you remove burrs in order to avoid dropping
burrs into the tubing.
Putting nut on
• Remove flare nuts attached to indoor and outdoor unit,
then put them on pipe/tube having completed burr
removal.
(not possible to put them on after flaring work)
Flaring work
• Carry out flaring work using flaring tool as shown below.
• Firmly hold copper pipe in a Bar in the dimension shown
in the table below.
Copper
pipe
90
°
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Flaring Work and Connection of Piping
mm
inch
mm
Ø6.35
1/4
1.1~1.3
Ø9.52
3/8
1.5~1.7
Outside diameter
A
Содержание DMH18DB-1
Страница 49: ...Service Manual 49 1 Room Type Indoor Unit Wiring Diagram Schematic Diagram 2 Outdoor Unit...
Страница 51: ...Service Manual 51 Schematic Diagram 2 Display ASSEMBLY 1 Split Type 6871A20682A...
Страница 52: ...52 Multi type Air Conditioner Schematic Diagram 3 Outdoor Unit 1 Component side...
Страница 53: ...Service Manual 53 Schematic Diagram 2 Solder side...