![Heat & Glo ST-HVBILP-AUB Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/heat-and-glo/st-hvbilp-aub/st-hvbilp-aub_owners-manual_2115073009.webp)
9
Heat & Glo • ST-HVBI-AUB • 2082-980 Rev. B • 3/11
Figure 6. Flue System Components and Termination Kits
1.3
Flue System Approvals and Installation
A. Flue System Approvals
These models are approved to use DVP series direct
fl ue pipe components and terminations (see Figures 5
and 6). Approved fl ue system components are labeled
for identifi cation. This pipe is tested and listed as an
approved component of the heater. The pipe is tested
to be run inside an enclosed wall. There is no require-
ment for inspection openings at each joint within the
wall. There is no required pitch for horizontal fl ue runs.
NO OTHER FLUEING SYSTEMS OR COMPONENTS
MAY BE USED
.
Detailed installation instructions are included with each
fl ue termination kit and should be used in conjunction
with this
Installers Guide
.
The fl ame and ember appearance may vary based on the
type of fuel burned and the fl ueing confi guration used.
Identifying Flue Components
The fl ue systems installed on this gas heater may
include one, two, or three 90° elbow assemblies. The
relationships of vertical rise to horizontal run in fl ue
confi gurations using 90° elbows
MUST BE
strictly
adhered to. The rise to run relationships are shown in
the fl ueing drawings and tables. Refer to the diagrams
on the next several pages.
This model has a 45° elbow built into it. It may be posi-
tioned to fl ue either horizontal or vertical. Depending on
the installation, decide which direction the elbow should
be facing. Remove the 8 screws from the corner cover
plate. Position the 45º elbow as desired and replace
the corner cover plate with the 8 screws.
HORIZONTAL TERMINATION
WALL FIRESTOPS
90º ELBOW
VERTICAL
TERMINATION
STORM COLLAR
ROOF FLASHING
PIPE LENGTH
CEILING FIRESTOP
TERMINATION KITS
DVP-TRAP2
DVP-TVHW