Heat & Glo • SOHO-B-CEB, SOHO-N-CEB, SOHO-P-CEB • 2111-980 Rev. i • 3/13
42
Figure 10.12 Ceiling Firestop (Ceiling Side)
Figure 10.13 Attic Firestop
CEILING
CEILING FIRESTOP
RAFTER
NAILS (4 REQUIRED)
JOIST
CEILING FIRESTOP
CEILING
NAILS (4 REQUIRED)
If the area above the ceiling
IS
an attic, position and secure
the firestop on top of the previously framed hole.
If the area above the ceiling is
NOT
an attic, position
and secure the ceiling firestop on the ceiling side of the
previously cut and framed hole.
Figure 10.14 Venting through the Wall
• The termination kit should pass through the wall firestops
from the exterior of the building.
• Adjust the termination cap to its final exterior position on
the building and interlock the flue sections.
WARNING! Risk of Fire!
the termination cap must be
positioned so that the arrow is pointing up.
• Use a high-temperature sealant gasket to seal between
the pipe and exterior firestop.
EXTERIOR
INTERIOR
Interior
Wall Shield
Inner Flue
Rear Flue
Heat Shield
3,8 cm min.
overlap
Outer Flue
G. Flue Termination
For Horizontal Terminations using the SLP-TRAP
To attach and secure the termination to the last section of
horizontal flue:
• The rear flue heat shield MUST be placed one inch (2,54
cm) above the top of the flue between the wall shield and
the base of the termination cap.
• One section of the heat shield is attached to the wall
shield. The other is attached to the termination cap in
the same manner (see Figure 10.14).
• The heat shield sections will overlap to match the wall
thickness (depth).
• If the wall thickness does not allow the required 1-1/2 in.
(3,8 cm) heat shield overlap, an extended heat shield must
be used. The extended heat shield will need to be cut to
the thickness of the wall and be attached to the wall shield.
• The small leg in the shield rests on top of the flue to
properly space it from the pipe section (see Figure 10.14).
Figure 10.15 Termination Cap
1 in. (2,5 cm)
7-1/2 in.
(19,2 cm)
MINIMUM
Cap Specification Chart
(depth without using additional pipe sections)
SOHO-CEB
SLP-TRAP2
Rear Vent Depth
5-1/2 in. (13,9 cm) to 9-1/2 in. (24,1 cm)
SLP-TRAP2 can adjust 4 in. 10,2 cm (5-3/8 to 9-3/8) (13,7 cm to 23,8 cm)