
Heat & Glo • RED60 Installation Manual • 2159-980 Rev. D • 11/13
42
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
A. Vent Collar Preparation
6
6
Appliance Preparation
FIBERGLASS
ROPE RING
BOTTOM PANEL SCREW LOCATIONS
1. Remove seal cap by lifting up and off of the starting
collar.
2. Place
fi
rst twenty-four inch vent section on the starting
collar.
WARNING! Risk of Fire!
A
MINIMUM
of twenty-four inch-
es vertical pipe is required prior to attaching any elbow to
the appliance.
3. Place
fi
berglass rope ring over initial twenty-four inch
vent section and position tightly to top of appliance.
4. Remove bottom metal panel by removing six screws.
Screw locations are shown in Figure 6.1. All screws
are located behind the panel: four on the bottom and
one on each side. Remove all six screws and gently
lift the panel off the appliance avoiding contact with the
non-combustible board if possible.
Figure 6.1 Location of Fiberglass Rope Ring