Heat & Glo • Soho-CE • 2111-900 Rev. D • 6/07
16
Installing the Ceiling Firestop
• Frame an opening 25.4 cm by 25.4 cm
whenever the system penetrates a ceiling/
fl oor (see Figure 6.3). A steeply slanted
roof may require an enlarged opening
size in order to maintain proper fl ue pipe
clearances.
• Frame the area with the same sized
lumber as used in ceiling/fl oor joist.
• When installing a top fl ue vertical ter-
mination appliance the hole should be
directly above the appliance, unless the
fl ue is offset.
• Do not pack insulation around the fl ue.
Insulation must be kept away from the
pipe.
Installing Attic Shield
Note:
An additional ceiling fi restop is not
required if attic shield is used.
• Frame opening for attic shield.
• Attic shield may be installed above or
below ceiling (see Figure 6.4).
• Secure with three fasteners on each
side.
• Fold tabs at top of attic shield in toward
fl ue pipe. Tabs must keep fl ue pipe cen-
tered within shield.
• Field construct additional shield height if
insulation is deeper than height of attic
shield.
C. Vertical Penetration Framing
Figure 6.3
ATTIC
ABOVE
A
B
Figure 6.4 Installing the Attic Shield
A
B
SL PIPE
25.4 cm 25.4
cm
3 FASTENER S
PER SIDE
BEND TABS IN
AROUND PIPE
ATTIC SHIELD INS TALLED
BELOW CEILING
ATTIC SHIELD INS TALLE D
ABOVE CEILING
Fire Hazard
Keep loose materials or blown
insulation from touching the
fl ue pipe.
• Hearth & Home Technologies requires
the use of an attic shield.
WARNING