GABLE INSTALLATION
Pre - assembled
PARTS REQUIRED:
2" (5,1 cm)
x90
x8
3" (7,6 cm)
6"
(15,2 cm)
2
3
4
1
BEGIN
Your gable units are now installed
Repeat STEPS 1 - 4 for the opposite side 10' gable (without window).
AF
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
DOUBLER
2-9/16"
(6,5 cm)
Measure and
Mark
2-9/16"
(6,5 cm)
Measure and
Mark
Fig. A
3" (7,6 cm)
Screws
Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart.
Continue securing panels to rafter with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws angled into each
AF
at an angle
(Fig. A)
.
Measure 2-9/16" down from top plate doubler and mark at each side as shown.
Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
FINISH