58
LEFT
DOOR
FINISH
Flush and center top spring bolt at the top of
OO (Fig. A)
. Secure with (4) 1-1/4" screws.
Mark spring bolt pin location on over door frame. Drill a 1-1/2" deep hole using a 3/8" drill bit.
DOOR HARDWARE
x2
Spring
Bolt
3/8" BIT
(9,5 mm)
PARTS REQUIRED:
2
3
x8
1-1/4 (3,2 cm)
BEGIN
¸
1
Fig. B
Your spring bolts are now installed.
Fig. A
Flush
Flush
69" (175,3 cm)
Door Stiffener
69" (175,3 cm)
Door Stiffener
3/8" drill for bolt:
1-1/2" deep.
3/8" drill for bolt:
1-1/2" deep.
OVER DOOR FRAME
FLOOR
OO
OO
x4
x4
CENTER
CENTER
Flush and center bottom spring bolt to bottom of
OO (Fig. B)
. Secure with (4) 1-1/4" screws.
1-1/4 (3,2 cm)
1-1/4 (3,2 cm)
With door closed, mark center location of
spring bolt pin on metal threshold
(Fig. C)
.
Raise spring bolt pin and open door.
Pre drill metal threshold at mark using a 3/16" bit.
Re-drill hole using a 3/8" bit. Drill at least 1-1/2" deep into fl oor
(Fig. C)
.
4
Fig. C
3/8"
(1,0 cm)
Drill at least
1-1/2"
(3,8 cm)
Содержание SOHO MODERN
Страница 2: ... This page is intentionally left blank ...