SIDE FASCIA TRIM
46
PARTS REQUIRED:
x12
2" (5,1 cm)
BEGIN
1
Place left side fascia assembly between roof sheathing and side soffit
(Fig. A, Fig. B)
.
Install fascia assembly under roof panels flush with front fascia board.
Secure with (6) 2" screws through roof sheathing
(Fig. A)
.
2
x1
LEFT FASCIA ASSEMBLY
LEFT FASCIA ASSEMBLY
FRONT W
ALL
ROOF
SHEATHING
Fig. B
Tight
FRONT
FASCIA
LEFT FACIA
ASSEMBLY
2" Screws
Fig. A
Flush
ROOF
SHEATHING
SIDE
SOFFIT
2" Screws
SIDE OF
SHED
Содержание SOHO MODERN
Страница 2: ... This page is intentionally left blank ...