45
Primed Side Out
Primed side out
Primed side out
Flush at peak
Flush to top of OSB
roof panels
Flush to top of OSB
roof panels
2" (5,1 cm)
Finish Nails
PDB
PDB
4-1/2"
(11,4 cm)
5-1/2" x 6-13/16"
5-1/2" x 6-13/16"
2
3
Install (2)
PDB
primed side facing out, fl ush at rafter peak and fl ush to top of OSB roof panels.
Fasten trim with 2" fi nish nails in pattern shown.
Install (4)
GI
projecting out past edge of OSB roof panels, two on each side of roof, as shown.
Fasten each with 2" fi nish nails.
Do not sink nails completely.
Install soffi t caps
(5-1/2" x 6-13/16")
with primed side facing out and fl ush to gable trim.
Fasten soffi t caps with (3) 2" fi nish nails.
Your rear gable trim is installed.
Remove temporary roof ledger boards.
FINISH
1
BEGIN
Flush trim up to bottom
of GI.
GABLE FASCIA - REAR
x22
2" (5,1 cm)
PARTS REQUIRED:
TEMPORARY
Use GI as temporary ledger-boards to help install trim boards.
Flush
Flush
TEMPORARY
x2
19/32 x 3-1/2 x 66-1/4" (2,5 x 8,9 x 168,3 cm)
PDB
x4
19/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm)
GI
x1
19/32 x 5-1/2 x 6-13/16"
(1,5 x 14 x 17,3 cm) LEFT
x1
19/32 x 5-1/2 x 6-13/16"
(1,5 x 14 x 17,3 cm) RIGHT
GI
Содержание ROCKPORT
Страница 2: ... This page intentionally left blank ...