
47
PARTS REQUIRED:
SHELF
FINISH
Your workbench, pegboard and shelf are now installed.
Repeat step 5 to secure right side shelf support to the back wall.
x6
2" (5,1 cm)
Fig. D
5
Reinforce left shelf support from outside.
Working outside, measure according to the diagram
(Fig. D)
and mark location of the shelf support.
Secure with (3) 2" nails.
15"
(
38,1 cm)
64-7/8"
(
164,8 cm)
Bottom edge of wall panel.