![Heartland 16615-G Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/heartland/16615-g/16615-g_assembly-manual_2114815014.webp)
12
I M P O R T A N T !
IMPORTANT!
DOOR
Ensure the foor frame is level after installing foor panels. Re-level if needed.
• The foor should used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process
to avoid over-handling of the walls.
HINT:
EAVE WALL
EAVE WALL
EAVE WALL
GABLE WALL
GABLE WALL