
ARB Approved IOM – Executive Orders VR-201-B and VR-202-B (Wayne Harmony WayneVac Dispenser)
Page 105
Healy Systems, Inc.
Website: http://www.healysystems.com
18 Hampshire Drive
Email: [email protected]
Hudson, New Hampshire 03051 USA
Telephone: 603.882.2472
ARB Approved Installation, Operation and Maintenance Manual (November 2006) Fax: 603.882.5189
Healy Systems, Inc. – the innovative leader of Stage II vapor recovery equipment
dispenser will increase the current draw of the dispenser by 2 amps. Use the label
supplied to note this change.
4. PARTS LISTS: (See Photo A)
1
VP1000 Vacuum Pump
1
1365A Wire Harness / MC100 Series Interface Module Assembly
Photo A
Photo B
Photo
C
Photo
D
HARDWARE KIT Z080H: (See Photo B)
2
1/4-20 bolts, washers, lock washers and nuts