Healy VP1000 Скачать руководство пользователя страница 10

ARB Approved IOM – Executive Orders VR-201-B and VR-202-B (Wayne Harmony WayneVac Dispenser) 

Page 112 

Healy Systems, Inc. 

                                                        Website: http://www.healysystems.com 

18 Hampshire Drive 

                                                                  Email: [email protected] 

Hudson, New Hampshire 03051 USA 

                                                                              Telephone: 603.882.2472 

ARB Approved Installation, Operation and Maintenance Manual (November 2006)                                    Fax: 603.882.5189 

 

 

 

Healy Systems, Inc. – the innovative leader of Stage II vapor recovery equipment

 

 

      

 

 

 

     

Photo 

       

 

 

 

 

Photo 

 

‰

 

Install a 3/8” NPT x 5/8” flare straight fitting into the vapor port of both outlet castings, 
see photo K.   

‰

 

Install a 3/4” NPT x 5/8” flare straight fitting into each end of the 3/4” elbow supplied in 
the Healy vapor kit. 

‰

 

Make up (3) pieces of 5/8” OD tube and attach as shown in photo K.  The lengths are 
approximately as follows: 15-1/2” from the right outlet casting, 4-1/2” from the left outlet 
casting and 10” from the 3/4” elbow to the tee.  Do not block column area. 

‰

 

Make up the following assembly, see photo L.  Note: The ball valve handle closes toward 
you.  Install a 1/2” NPT x 5/8” flare straight fitting to the left side of the ball valve, install 
the 1/2” close nipple to the right side then the 1/2” reducing tee and the 1/2” NPT x 5/8” 
flare elbow – completely tighten the tee with the 1/4” branch facing up and the elbow also 
facing up, install the 1/4” pipe plug into the branch.  

‰

 

Make up a piece of 5/8” OD copper tube that will go from the flare elbow on the inlet of 
the VAC pump, through the upper 1-1/8” hole in the column to the straight flare fitting on 
the ball valve assembly so that when installed and secured, positions the flare elbow on 
the ball valve assembly in a straight line with the straight flare fitting that’s attached to 
the 3/4” elbow of the upper vapor manifold.  Install and tighten with the ball valve 
assembly in position as shown in photo L. 

‰

 

Make up a piece of 5/8” tube to connect the flare elbow on the ball valve assembly to the 
straight flare fitting that’s attached to the 3/4” elbow of the upper vapor manifold.  This 
piece should be made so that when installed the ball valve assembly and tubing should 
be horizontal or slightly pitched toward the pump to avoid liquid traps.  Install and 
tighten. 

Содержание VP1000

Страница 1: ...TEM KIT Z080 OUTLINE NOTICE USE THIS PROCEDURE IF CONVERTING A WAYNE VAC VAPOR RECOVERY ASSIST SYSTEM TO A HEALY VAPOR RECOVERY ASSIST SYSTEM See Healy Systems Kit Z078 For Dispensers With Balance Sys...

Страница 2: ...electrical and hydraulic plumbing fittings referred to in these instructions must be UL listed or recognized for the purpose 2 SAFETY Before installing the equipment read understand and follow The Nat...

Страница 3: ...ation Operation and Maintenance Manual November 2006 Fax 603 882 5189 Healy Systems Inc the innovative leader of Stage II vapor recovery equipment dispenser will increase the current draw of the dispe...

Страница 4: ...4 machine screw washer nut 1 1 2 male NPT x 3 4 female NPT electrical reducer fitting 1 1346 potted conduit nipple 1 8 Ring tong terminal 1 Notice label p n 1406 1 UL Listed label p n 1410 VAPOR KIT...

Страница 5: ...wide and Phillips 5 8 copper tube bending tool 5 8 copper tube flaring tool Copper tubing cutter Electrical multi meter Small hand brush 1 1 2 thick for clearing chips 12 adjustable wrench 10 pipe wre...

Страница 6: ...pump cover facing the A side of the dispenser see photo E This is the side that the vapor tubes from the out port of the Wayne VAC vacuum pumps are connected to a vapor tee mounted at the base of the...

Страница 7: ...rn line impact valve If there is no impact valve be sure to have proper plugs or caps available to plug the Stage ll line before disconnecting the Wayne VAC equipment Unscrew the flare nuts holding th...

Страница 8: ...arness from the bottom of the potted nipple under the J box to the Wayne VAC electronics control board 887227 remove the 2 connectors from the board and also the green ground wire attached to the chas...

Страница 9: ...re down an additional 6 3 4 and mark on the centerline These marks are the centers of the holes for the vapor pipes going to the VP1000 DO NOT DRILL verify positions in the next steps Get the vapor pu...

Страница 10: ...oward you Install a 1 2 NPT x 5 8 flare straight fitting to the left side of the ball valve install the 1 2 close nipple to the right side then the 1 2 reducing tee and the 1 2 NPT x 5 8 flare elbow c...

Страница 11: ...n install the two 1 4 20 bolts washers lock washers and nuts to secure the pump Photo M Photo N Measure and cut appropriate length of 5 8 tubing to reach from the 5 8 flare elbow on the outlet of the...

Страница 12: ...ure there is at least five full threads of engagement of the fittings in their respective couplings Thread the pump wires through the elbow that was removed from the Wayne VAC motor electronics housin...

Страница 13: ...THE ELECTRONICS COMPARTMENT See Photos Q R S T Photo Q Photo R In the electronics bay locate the light assembly on the upper right side of the cabinet see photo Q In photo R notice the 3 16 hole that...

Страница 14: ...le multiconductor cable that is wired to the interface module is routed up to the computer board 173976 see photo T Disconnect the valves cable that s in the J3 connector and install in the female sid...

Страница 15: ...n the highest position Be sure to check for proper fit in the nozzle holster and that the nozzle can be locked in the off position Also be sure that when the nozzle is locked that the dispenser can no...

Страница 16: ...s a 0 100 water column gauge Connect the gauge into the 1 4 test port of the reducing tee installed earlier in section 10 Photo L Continue by following and completing the START UP NEW INSTALLATION WAR...

Страница 17: ...equipment If diagnosing a problem where the LED is already illuminated a steady light indicates a low current condition therefore expect a vane or rotor problem If the LED is blinking that indicates a...

Страница 18: ...racks chips or breaks Replace rotor and vanes if any damage is found PN VP1000VRC 7 If no visible damage is apparent the existing rotor and vanes may be reused after thoroughly cleaning with isopropyl...

Страница 19: ...ARB Approved IOM Executive Orders VR 201 B and VR 202 B Wayne Harmony WayneVac Dispenser Page 121...

Страница 20: ...ARB Approved IOM Executive Orders VR 201 B and VR 202 B Wayne Harmony WayneVac Dispenser Page 122...

Отзывы: