HCSTEAM−16/−35 SERIES

Conventional 24 VAC
Humidistat (Cat no.
X9553 or equivalent)

NO

C

NC

C

NO

Alarm
terminals
(if used)

Outdoor AC Unit

Note 1. Blower interlock is required.

Note 2. 48G96 relay field supplied.

Note 3.  Remove factory jumper between AB−AB

48G96 SPDT Interlock Relay

C
NO

Thermostat

Required Air Proving
Switch (provided)

GND

24VAC

N2

GND

N1
AB
AB

GND

IN

Typical Air Handler /
Furnace Control
(AHC or IFC)

(not
used)

(not
used)

Humidifier
low voltage
wiring panel

Figure 13. Humidifier with conventional 24V humidistat and interlocked with HVAC blower

S

When the humidity in the space falls below the conventional humidistat’s RH set point, the circuit closes from "GND" to "IN"
on the humidifier controller and in turn, closes the EXT FAN contacts ("NO" to "C") in the humidifier controller.

S

Terminal R on the furnace or air handler feeds 24V to the EXT FAN contacts (now closed) and to the blower interlock relay
coil. The interlock relay normally−open contacts close to energize G" on the furnace or air handler and start the indoor blower
(if not already running by a heating demand). The interlock relay also isolates G" from the thermostat to prevent a back feed
that would start the outdoor unit.

S

When the indoor blower achieves sufficient speed, the air proving switch contacts close completing the circuit from "AB" to
"AB" on the humidifier controller. Steam production will now start and continue until the humidistat demand is satisfied.

S

When the humidistat has reached its RH set point, its contacts open stopping steam production. The humidifier controller EXT
FAN contacts open, de−energizing the blower interlock coil and stopping the indoor blower (if not running due to a heating
demand or thermostat blower demand). When the indoor blower stops, the air proving switch contacts will open.

SLP98 Furnace /
CBX40 Air Handler

C
NO

Note 1. Do not connect H" on CS7000 to H" on furnace

or air handler control board.

Note 2. Set up humidifier per CS7000 thermostat installa-

tion instructions.

Note 3. 48G96 relay field supplied.
Note 4. Remove factory jumper between AB−AB.

Outdoor AC Unit

ComfortSense

®

 7000

Thermostat

48G96 Relay

Alarm
terminals
(if used)

(not
used)

(not
used)

(not
used)

Required Air Proving
Switch (provided)

NO

C

NC

C

NO

GND

24VAC

N2

GND

N1
AB
AB

GND

IN

Humidifier
low voltage
wiring panel

Figure 14. Humidifier with ComfortSense

®

 7000 thermostat used as humidistat and interlocked with

HVAC blower

S

Humidification is controlled by the humidity sensor in the thermostat

. When the humidity in the space falls below the thermo-

stat’s humidity RH set point, 24 volts goes on the thermostat’s "H" terminal to energize the humidifier isolation relay coil which
closes the open set of contacts in the relay, and completes the circuit between "GND" and "IN" on the humidifier controller.

S

The thermostat will also send power to the "G" terminal on the air handler or furnace control to start the indoor blower.

S

When the indoor blower achieves sufficient speed, the air proving switch contacts close completing the circuit from "AB" to
"AB" on the humidifier controller. Steam production will now start and continue until the humidity demand is satisfied.

S

When the RH set point is reached, the thermostat removes 24 volts from H" which opens the isolation relay circuit and, in
turn, opens the circuit between "GND" and "IN" on the humidifier controller, stopping steam production. The G" signal will
also be removed to turn off the blower (if not running due to a heating demand or thermostat blower demand). When the indoor
blower stops, the air proving switch contacts will open.

Содержание HCSteam?16

Страница 1: ...pping damage or missing components if found immediately report any discrepancies to the last carrier INSTALLATION INSTRUCTIONS HCSteam 16 35 Residential Healthy Climate Steam Humidifier INDOOR AIR QUA...

Страница 2: ...through an electric fill valve Periodically based on the water quality the unit will also drain some water to di lute the build up of minerals in the steam generator This humidifier has been designed...

Страница 3: ...cylinder A flow restrictor 4 prevents the unit from filling too quickly or with too much pressure The water flows up the fill tube 2 and into the fill cup 3 Water then flows over the dam in the fill c...

Страница 4: ...hole mounting pattern and for connections to the humidifier and to the condensate drain Also see figure 6 for a typical installation diagram Drill a 2 1 4 57 mm hole in the ductwork at the selected lo...

Страница 5: ...5 128 10 1 8 257 2 1 2 65 Dimensions in inches mm 1 7 8 48 2 3 4 70 2 1 8 54 3 8 9 17 5 8 448 3 7 8 98 1 1 2 38 2 3 8 60 2 3 8 60 23 5 8 600 3 5 8 92 5 8 16 3 1 4 82 1 3 8 35 2 dia 51 7 8 dia 23 1 5...

Страница 6: ...rt to the negative pressure tap Check for closure of the switch when blower is turned on Plumbing Water characteristic requirements The humidifier must be supplied with water with the following charac...

Страница 7: ...ILTER Recommended SUPPLY WATER EXTENSION TUBE SHUTOFF VALVE AND FILTER Recommended OPEN DRAIN DRAIN LINE Water inlet with filtering screen 3 4 hose con nection 1 1 4 Water drain STEAM HOSE ADAPTER FIL...

Страница 8: ...jection The maximum allowed duct static pressure is 2 w c The HCSteam 16 35 humidifier include a plastic injection nozzle figure 7 CONDENSATE CONNECTION 2 1 2 63m 2 1 2 63m STEAM INLET O D 2 2 56mm dr...

Страница 9: ...0 3 m TYPICAL INSTALLATION WHEN UNIT IS ABOVE THE STEAM NOZZLE 5 ft 1 5 M MAX 5 ft 1 5 M MAX IF NO SLOPE 3 9M MAX 20 5 10 ft 3M MAX 5ft 1 5 M MAX 20 5 GENTLE BEND OBSTRUCTION SUPPORTED STEAM HOSE AND...

Страница 10: ...ct the ground wire to the unit s chassis ground lo cated just behind the power wiring terminal block see fig ure 11 C L1 L2 A B C SERVICE DISCONNECT STRAIN RELIEF L1 L2 GND GND WIRE NUT POWER CONTROL...

Страница 11: ...a heating demand or thermostat blower demand When the indoor blower stops the air proving switch contacts will open SLP98 Furnace CBX40 Air Handler C NO Note 1 Do not connect H on CS7000 to H on furna...

Страница 12: ...he thermo stat s humidity RH set point a demand message for humidification is sent to the HVAC unit control board S The demand message starts the indoor blower and sends a 24 volt signal from the H te...

Страница 13: ...sent to the furnace control board S The demand message starts the indoor blower and closes the HUM contacts on the furnace control 24 VAC passes through a field installed jumper from the R terminal on...

Страница 14: ...EXT FAN contacts open de energizing the blower interlock coil and stopping the indoor blower if not running due to a heating demand or thermostat blower demand When the indoor blower stops the air pr...

Страница 15: ...rogramming port Connecting to Programming port or supervisor factory use only AB AB Remote enabling input Imposes an external NO contact Rmax 300 Ohm Vmax 33 Vdc Imax 6mAdc humidifier enabled contact...

Страница 16: ...wired to close when air flow is proved S Hi limit humidistat if used is wired to open on humid ity rise above setpoint S Unit wires have been checked to make sure they and all connectors are tight fr...

Страница 17: ...f 03 or higher not applicable for these models If value is higher than 02 press reset sel until the display goes back to the normal operating mode and re start from step 1 4 Press and hold drain mini...

Страница 18: ...humidifier back on DO NOT release reset sel and drain buttons until the wrench icon blinks then re lease both buttons 3 Press reset sel until the display shows 03 DO NOT confirm any value higher than...

Страница 19: ...y used for 2000 hrs Press reset sel key for 1 seconds to reset Off Change cylinder not urgent E4 Fill alarm unable or slow fill current does not increase within timeout Press reset sel key for 1 secon...

Страница 20: ...rrectly 2 Increase air flow in duct or decrease maximum steam production setting see Page 17 3 Check the connection of the device flow switch or differential pressure switch controlling the humidifier...

Страница 21: ...nd the general condition of the cylinder Check that during operation there is no arcing between the electrodes S Every three months or no more than 1000 operating hours Check operation that there are...

Страница 22: ...the electrical connections from the top of the cylinder 7 Carefully remove cylinder from the pump manifold Make sure the O ring remains in the manifold see fig ure 26 8 Verify cylinder model voltage f...

Страница 23: ...5 S Steam Nozzle Y3781 Table 6 Technical Specifications Steam flows VAC kW 5 5 lbs hr 2 5 kg h 110 120 VAC 1 phase 50 60 Hz 1 86 kW 12 lbs hr 5 4 kg h 220 240 VAC 1 phase 50 60 Hz 4 05 kW Notes Steam...

Страница 24: ...Page 24 506746 01 05 12 070222075 rel 1 2 dated 25 05 2012...

Отзывы: