4 Planning and installation – Installing the heating system
40
4.
Move the ceramic fibre plate (1) over the long nuts (2) to the
boiler.
5.
Install the small lever (6) with the M5 hexagon socket screws (SW4)
and spring ring on the cleaning shaft.
6.
Screw the M8 threaded pin (3) into the long nuts (2).
7.
Screw the M8 nuts (SW13) onto the threaded pin (3).
8.
Set the washers onto the threaded pin (3).
9.
Install the support plate (4) for the cleaning system motor and the
limit switch with the M8 screws (SW13) and the washers on the
threaded pin (3).
10.
With the help of the M8 nuts (SW13), set the spacing of the
support plate (4) so that the hook (5) runs centred on the roller of
the lever (6).
11.
Run the cable from the cleaning system motor and from the limit
switch to the central module and insert it at slot x50 or X33.
✎
Also refer to “Electrical plans for the HDG log wood boiler”.
✓
The automatic cleaning system is now installed.
F
ITTING
THE
CLADDING
Figure 4/15 - Installing the cleaning system motor
1
3
6
4
2
5
The cladding should only be installed after the water and flue-gas
piping and electrical wiring.
The cladding packets are numbered chronologically. The number
also corresponds to the order in which the cladding part is needed.