![HDG F20 Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/hdg/f20/f20_operating-manual_2112429035.webp)
4 Planning and installation – Installing the heating system
35
6.
Install the dummy plugs (3 + 9) on the three-way switching valve
(2) or T-piece (2).
7.
Install the pipe double nipple (1 + 11) on the three-way switching
valve (2) or T-piece (2).
✓
The hydraulic connections are attached.
I
NSTALLING
THE
HDG
CONTROLS
CONTROL
UNIT
I
NSTALLING
THE
CONTROL
UNIT
1.
Undo the four lateral M5 screws (SW8) and carefully lift the
support plate (1) out of the holder.
2.
From behind, set the two spacer plates (3 + 6) onto the welded
screws on the support plate (1).
3.
Move the HDG Control Touch control unit (5) from behind to the
welded screws on the support plate (1).
4.
Fasten the HDG Control Touch control unit (5) on the support
plate (1) with the M4 nut (SW7).
Important!
✎
For the further installation of the log wood/pellet combination
HDG FK Hybrid, see the "HDG K hybrid operating manual".
Figure 4/10 - Installing the control unit
2
1
4
6
5
3
Important!
Damage caused by improper disassembly
The overheat cut-off device (2) is already pre-mounted on the
support plate (1), the line connected and the capillary tube of the
overheat cut-off device sensor installed. When removing the
support plate, the overheat cut-off device or the capillary tube may
be damaged.
During disassembly of the support plate, ensure that the overheat
cut-off device and the capillary tube are not damaged.
The two spacer plates are packed and delivered in cladding
package 1.
Содержание F20
Страница 1: ...hdg bavaria com HDG F20 25 30 HDG F40 50 Operating manual ...
Страница 2: ......
Страница 87: ......